G March 1, 1980 BECo Ltr #80-40 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Docket No. 50-293 License DPR-35
Subject:
Februarv, 1980 Monthly Report
Dear Sir:
In accordance with PNPS Technical Specification 6.9.A.2, a copy of the Operational Status Su==ary for Pilgri= Nuclear Power Staticn is attached for your information and planning.
Respectfully submitted, p
P.
McGuire Station Manager Nuclear Operations GGW:ep cc: Director Office of Inspection and Enforcement Office of Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Director of Region I L
Jffice of_ Inspection and Enforcement U. S. Nuclear Regulatory Commission i
631 Park Avenue l
King of Prussia, PA 19406 bec: Messrs. J. E. Howard R. J. Schug Mrs. K. Calderone G. C. Andognini J. A. Seery~
NOD Licensing R. A. Canalas(G.E.)
R. Sevigny PNPS Records Center E. L. Cobb W. M. Sides P.J.M. (LB)
R. S. Hahn D. G. Stoodley M. G. Mensch R. Tis C. J. Mathis C. K. Vantrease J. A. Murphy G. G. Whitney 8 003190 hlC7 J. W. Nicholson F. J. Wiedenmann S. L. Ros en Mrs.
C. M. Gaffney
_ = _ _ _
s e
OPERATING DATA REPORT 50-293 DOCKET NO.
DATE 3/1175'6 COSIPLETED hY G.G. Whitney 61/-/46-/900 TELEPil0NE OPER AT!NG.C. TAT *JS
- 1. lInit Name:
February, 1980
- 2. Reportin: Period:
1998*
- 3. Licensed Themtal Power I)1Wt):
678
- 4. Namepiste Ra:ing (Gross 31We):
655
- 5. Design Electrical R:.in- (Net 31We):
g 690
- 6. >!aximum Dependabic Capacity (Gross 31We):
670
- 7. Staxirnum Dependh e Cap: city (Net StWe):
- 8. If Ch:nges Occur in Capacity Ratin;s (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted.lf Any (Net 51We):
None
- 10. Reasons For Restrie: ions,If Any:
N.A.
This Month Yr..to.Date Cumulari,e s
696.0 1440.0 63336.0
- 11. Nours In Reporting t'eriod, 0.0 96.1 45077.0
- 12. Number Of !!ours Ite:ctor Was Critic:t 0.0 0.0 0.0
- 13. Reactor Resene Shutdown !!ours
- 14. limtrs Generator 0n.Line 0.0 96.1 43648.6 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Iinurs 0.0 181152.0 73272264.0
- 16. Gross Thermal Ener;y Generated (31WFI) 0.0 61340.0 24226174.0
- 17. Gross Electric:1 Ener;y Generated (stWii) 0.0 58860.0 23264983.0 IS. Net Electrical Energy Generated (31Wii) 0.0 6.7 68.9
- 19. Unit Service factor 0.0 6.7 68.9
- 20. Unit Av:ilability Factor D*1 M *D
- 21. Unit Capacity Factor Ilhing 31DC Net) 0.0 6.2 56.1
- 22. Unit Capacity F:ctor(thing DER Net)
- 23. Uni: Forced Outsp.e Rate 0.0 0.0 10.6 24.- Shutdowns Schedt.te ! Over Next 6 Stonths tty,e. Date,aiul Duration of E.ich t:
Refuel Outage comencing Jar. 5,1980
- 25. If Shut Down At End Of!!ct ort Period.Estime.ted Date of Startup: Estimated startup April 7. 1980,
- 20. Units in Tet.t Status iPrior eo Commercial OperationI:
Forecast Achioed INITI A!. CRITICA LITY INillA1. I: LECT!t! CITY CO.'.1'ill 11 CIA L Ol'EitAT 0N D**D "I D T
A 0'l771 owl e.).d A
.a
AVERAGE DAILY UNIT POWER LEVEL
~
DOCKET NO.
50-293 LWIT Pilgri:n I DATE 3/11/80 COMPLETED BY G.C. Whitnev 1
617-746-7900 j
TELEPHONE MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Neti (MWe-Net) 0 o
1 37 0
2
- 3 0
0 3
39 0
0 20 0
4 0
5 33 o
0 6
0 3
7 0
3 0
0 8
34 o
0 9
25 0-0 10 26 0
0 0
11 37 0
o 12 33 0
0 13
- 9 0
14 30 0
15 33 0
16 t
INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each ds) in the reporting month. Campute to the nearest whole megawatt.
to/77) i l
l
RETUELING IN70RMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:
Por your convenience, the infor: nation supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.
1.
The name of this facility is Pilgrim Nuclear Power Station, Docket No.
50-293.
2.
Scheduled date for next Refueling Shutdown:
January 1980.
3.
Scheduled date for restart following refueling: April 1980.
4.
5.
Due to their similarity, requests 4, 5, & 6 are responded to collectively.
6.
The' fuel, which is presently expected to be loaded during the next scheduled refueling outage, is of the new P8x8R design, consisting of approximately 64 P8DRB282 assemblies and 120 P8DR3265 assemblies. The licensing submittal and proposed Technical Specification changes were submitted on December 12, 1979.
7.
(a) There are 580 fuel assemblies in the core.
(b) There are 580 fuel assemblies in the spent fuel pool.
8.
(a) The station is presently licensed to store 2320 spent fuel assemblies.
The actual spent fuel storage capacity is 1770 fuel assemblies at present.
(b) The planned spent fuel storage capacity is 2320 fuel assemblies.
'9. With present spent fuel in storage, the spent fuel pool now has the capa-city to accommodate an additional 1190 fuel assemblies.
4 9
Pilgrim I DOCKET NO.
UNil'SiluillOWNS ANil POWER REDilC110NS UNII NAME 3/11/80 DA1E G.G. Whitney REPORI lONill February, 1980 COMrl.ETEli BY 617-746-7900 1ELEPlf0NE 3
.2 e E
g E :4 I itensee
$'t g"L c_
r.
- 5 u.
g Cause & Conective No.
Ilate 9
gg g
jgy
- cycn,
- y q
gg;,,,o F
g$ E 5
j@g Repost #
d'0 0
Picsent Recussence b
1 80/01/05 S
696.0 C
2 N.A.
RC FUELXX N.A.
I 2
3 4
F: Forced Reason:
Metimd:
Exhibit G. insieuctions S: Scheduled A.Eiguipment Failure (Explain) 1 Manual for Picparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for I.icensee C-Refueling 3 Automatic Scram.
Event Repius (LER) File INURI G-D.Regulaiosy Restriction 4 Other (Explain) 0161)
E Operain Tsaining a license Fxamination F-Administrative 5
G-Operational Enos (Explain)
L%ibit I - Same Source 19/17) 11 Other (limplain)
f BOSTON EDISON COMPANY PILGRIM NUCLEAR POWER STATION Summary of Operations for-February, 1980 The unit has been shut down all month for the 1980 Refueling Outage.
All outage work continues and is on schedule.
4 I
\\1 1
H
- L D
E T
A 6
I C
08 O
A.
A.
A.
A.
A.
A.
9 S
S A
N N
N N
N N
1 Y
RAU R
BEF r
Ne h
Ov t
Ie n
T n-o C o-M At ic-E e-Vn I
T m_
Ce E r-Rr-i Rv O o_
C n_
A.
A.
A.
A.
A.
A.
n N
N N
N N
N e
ti#
E t
c s
N C 2
c a
s r
O N 7
s e
i e
i s
d t
g I
A E
T N C
h d
/
f hr t
/
c d
o t a A E N
i t
s ne s
ip T T A
ws a
i at ws S N N
e e
d i
g E
d v s
tl n
dd I
R A T
ei e
al i
ee E M N
cr n
c ee c
cv W
I ad i
a st as ao O D A
l l
s l t l r P E M
pw p
p p -
pa pp T
ee a
e ae ee em R A Rn L
R Lr R s Ri A L E E
.l L R CU Y n
~
N T o
E n
i n
n a
o M F E
d o
s o
u i
o s
s e
I A S
r s
r rt rt R S U
C o
r aa aa A.
C A
r o
ee ee L R C
E C
Ws Ws N
I 0 F
1 M
e tar N
e t
O p
s I
O e
t t
t TC o
a a
t e
e k
T N
s s
a R
U t
e L
F l
y y
l L
L u
b b
A c
d d
M i'
s s
e e
f k
k l
l A.
f a
a i
i i
e e
a a
D L
L F
F
'N hce e
h 3
v c
T l
1 a
r r
N D
0 v
Ae es E
R 3
s 8t t r N
5 a ae C
2 k
'V we wg C
c M
?
V e
I
,d v
d r
)
O h
S Ael ea C
M C
M 2 ea ep C
6F v F s i
E 3
3 9
1 6
4 2
2 5
TS i'
- l 6
l 1
-