ML19305B078
| ML19305B078 | |
| Person / Time | |
|---|---|
| Issue date: | 02/13/1980 |
| From: | Beltracchi L Office of Nuclear Reactor Regulation |
| To: | Satterfield R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8003190112 | |
| Download: ML19305B078 (3) | |
Text
.
5
,C f c ur.
0 UNITED STATES 8
~,j -
OP/
NUCLEAR REGULATORY COMMISSION 3
E WASHINGTON, D. C. 20555 1,,***
FEB 131930 MEMORANDUM FOR: Rodney M. Satterfield, Chief Instrumentation & Control Systems Branch, DSS FRCM:
Leo Beltracchi Instrumentation & Control Systems Branch, DSS
SUBJECT:
DISTURBANCE ANALYSIS SYSTEMS TECHNICAL DISCUSSIONS WITH HALDEN PROJECT Date & Time:
February 20, 1980 9:00 a.m. - 5:00 p.m.
Location:
Room P-500 Bethesda, Maryland
Purpose:
Mr. Bjorlow and Mr. Trengeried from the Malden Project will describe work being done on disturbance analysis systems and alarm prioritization, including Halden's cooperation work with the Ringhals Plant in Sweden. Research projects, prototype evaluations and licensing concerns regarding Disturbance f.nalysis Systems are to be informally discussed.
' Participants _:'
Halden Mr. Bjorlow
~'
Mr. Trengeried NRC V. Moore h
@\\J1 @g S. Hanauer a!
R. Satterfield R. Ramirez u
R. Di Salvo V. Johnston L. Tong T. Murley
/
}Q,g/
L o Beltracchi 4
g Instrumentation & Control Systems Branch [7 Division of Systems Safety Y
8003190lll
,[
.) AGENDA Again, the topic dealt with in the Halden Board Project was proposed to be I
discussed in the list of the following subjects:'
SYSTEMS FOR OPERATION IN REACTOR SURVEILLANCE Core Service and Control Distrubance Analysis and Alarm Handling Computerization of Operation Manuals l
Failure Detection by Noise
(
High Balance Evaluation Analysis (No active work in Halden Project)
~
l OPERATION CAPABILITIES Factors influencing Operator's Performar.ce Operator Role Operator Training by Use of Onsite Simulators Design of New Control Room and Back Fitting of Old In Light of HumanEngineeringfrjnciples.
l l
PROCESS COMPUTER RELIABILITY REQUIREMENTS Hardware and Software Structures Validation Needs Maintainability HALDEN PERSONNEL Mr. Helge Smidt Olsen, Chief, Process Control Research Mr. John Kjell Trengeried, Head of Control and Surveillance Systems Development
~
Mr. David Lundberg, Manager of the Swedish State Power Boards Project Mr. T. Vic, Manager of Halden Project A summary of the research activities at Halden will be given as an introduction to the above topics.
.s
MEETIN i;0TICE DISTRIBUTION r
I $.
ICSB NRC PDR, M R. Tedesco Local DPR S. Pawlicki TIC F. Schauer NRR Reading K. Kniel H. Denton T. Novak E. Case Z. Rosztoczy H. Berkow R. Bosnak R. Mattson W. Butler R. DeYoung F. Rosa D. Muller V. Moore D. Ross W. Kreger D. Vassallo M. Ernst D. Skovholt R. Denise F. Williams R. Ballard J. Stolz B. Youngblood R. Baer W. Regan O. Parr G. Chipman L. Rubenstein R. Houston S. Varga J. Collins g
P. Collins T. Murphy T. Speis G. Lear 14 Haass M. Spangler C. Heltemes V. Benaroya ACRS (16)
R. Jackson L. Crocker L. Hulman B. Kirschner H. Ornstein ELD J. LeDoux, IE IE(3)
Principle Staff Participants SD (7)
E. liylton R. Satterfield -
Receptionist R. Rameriz
~
L. Soffer L. Beltracchi J. P. Knight R. Di Salvo S. Hanauer V. Johnston L. Tong T. Murley O
L