ML19305A550
| ML19305A550 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 08/30/1979 |
| From: | Herbein J Metropolitan Edison Co |
| To: | Grier B NRC Office of Inspection & Enforcement (IE Region I) |
| Shared Package | |
| ML19305A551 | List: |
| References | |
| GQL-1129, NUDOCS 7909050408 | |
| Download: ML19305A550 (1) | |
Text
f-.._.-.,_...__
ggg nay ga Metropolitan Edsson Company j g l [ J :'3 eednf' f
('Jj Post Office Box 542 Reading Pennsyfvania 19640 215 929-3601 Wr6ter's Direct Dial Number August 30, 1979 GQL 1129 Mr. B. H. Grier, Director Office of Inspection and Enforcement Region 1 U. S. Nuclear Regulatory Commission King of Prussia, Pennsylvania 19406
Dear Sir:
Three Mile Island Nuclear Station Unit 1 & 2 (TMI-1 & TMI-2)
Operating License Nos. DPR-50 and DPR-73 Docket Nos. 50-289 and 50-320 Fadioactive Effluent Release Report In accordance with the requirements of TMI-1 Technical Specifications, 1
Appendix B Section 5.6.1.b, enclosed please find two copies of the TMI-l Radioactive Effluent Release Report.
Additionally, please find enclosed two copics of the Radioactive Effluent Release Report for TMI-2, although there is no specification requiring this report.
Please be advised that there is no Joint frequency Table of wind speed and direction versus delta temperature for specific period in the second quarter of 1979 from Unit 2 since there was only one gaseous release (five minutes) in the second quarter (April 3).
Other discrepencies are as noted in these reports.
These reports cover the period January 1,1979 throu;;h June 30, 1979.
Sincerely,
/s/ J. G. Herbein J. G. Herbein Vice President-Nuclear Operations JGH:LWH:tas Enclosures i
ec:
Mr. Harold Denton, Director Office of Nuclear Beactor Regulation h
i U. S. Nucicar Regulatory Commission k
Washington, D.C.
20555
\\
7000 0 5 0 t/d N Metrocottan Ed: son Company is a Mamter of the General Punhc UtJtes Sys%m