ML19305A239
| ML19305A239 | |
| Person / Time | |
|---|---|
| Issue date: | 02/15/1979 |
| From: | Dougherty D NRC OFFICE OF ADMINISTRATION (ADM), R.W. BECK & ASSOCIATES |
| To: | |
| Shared Package | |
| ML19305A238 | List: |
| References | |
| CON-FIN-B-6523, CON-NRC-03-79-129, CON-NRC-3-79-129 NUDOCS 7903080155 | |
| Download: ML19305A239 (5) | |
Text
PAGE OF STAND AR? FORM 26. JULY 1966 AWARD / CONTRACT 1
5 7
com.u servias ADoiNisnAnON Flo. PROC. REG. idlCriti l -l e.1 D I
- b. CONTILACT (Prof. Iost. Idest./ NO.
- 2. Eff fCTIVE DATE
- 3. AfoUtstTION/PURCHAst atoutst/ PROJECT NO.
NRC-03 129 2/15/79 Ai NG S 155UED SY CODE
- 6. ADmNisTERED BY CODE l7.Ofuvity fos DESTI (ll ether thee bluk S}
O NATO ~
U.S. Nuclear Regulatory Commission Of ste < s,,
Division of Contracts Washington, DC 20555 raCiurr CoDr
- 9. D sCouNT FOa raO=ri rAvarNi
.. comaAcTO:
Coor j__ ~~ ~
NAME AND ADDRESS l
R. We Beck & Associates, Inc.
(5,,,.,i,,.
<e-air. s-,.
400 Prudential Plaza Denver, Colorado 80265 i D. su T.Nvoices u,eps,, sei,s, e,6, y spenfed) TO ADDRESS sHOWN IN BLOCK L.
1 II. 5 HIP TO/ MARK 70 CODrl
- 12. PAYMENT WILL BE MADE BY CODE U.Se Nuclear Regulatory Conc U.S. Nuclear Regulatory Commission ATTN: Mr. Roy Lessy Office of the Controller Office of the Executive Legal Director Washington, DC 20555 Washington, DC 20555 to u 5.C. 2304 (ex )
- 13. Tuis raOCuafMENT WAs C ADvunsED,9 NEGOTIATED, PURsuAM TO:
d di U.S.C. 252 (c41
- 14. ACCOUNTING AND APPROPRIATION DATA 20-19-05 86523 Obligation
($20,000.00 13.
le.
17.
18 19.
20.
ITE M NO SUPPLIES /sERvlCEs O U A NTIT Y UNIT UNIT PRICE A MOUNT This Time / Material contract is issued pursuant to the Terms and Conditions of Basic Ordering Agreement No. NRC-03-77-127-10, for Engineering Assistance Related to the Antitrust Hearings for the South Texas Nuclear Generating Station, Units 1 and 2, (South Texas), and the Comanche Peak Steam Electric Staticn, (Units 1 ar.d 2), (Comanche Perk).
CEILING ^"oum of co"T"Aci s 20,000.00 CONTRACTING OFFICER WILL CO.\\1PLETE BLOCK 22 OR 26 AS APPL 1 CABLE
- 22. & CONTRACToe's NtGOTIATED AGnttutNT (Costracter is required se sige
- 26. C AwAnD (Contracter in ser required se sige shis duumret.)
s seau e er 3
,e,;,,,, ;,,efe,,g,.)
Co.,e,. e,,een es s,,,,,, e n.
,e -
inci.d.no,e sais dusaerea eed ersnre le fwen.sh and deliver oil ate.s or perfeens all the serveces set forth ee otherw.se odd.heas or thenges wiede by yee.h.ch oddet.eas et changes are set festh en fvH ebeve, is keeeby ecces ed es to the i+,*s 1.s'ed ebeve end ca ear coat avoi.ee she*'s idenh6ed ebeve end on any tone.aese.en sheets for the ceasideration stated heresa.
s The e.stes sad obi.geneas of *e pe,nes se S cenereo shots be sobied to sad se*
T his e-eed cons...eees the ceanoo web coas.s's of the felle-as deev'a**s fe' a r, ead (b) eh s e-ord/coanec' he eraed by the feliw.ae dec...es. (e) th. e.eed/conireo, (b) ehe sol.c,sehea,.I ear, she co..... s sei.e.,e,.ee oad yew e e
end (c) s.ch pee...
a. eep.eseaeeneas, ce,e.kove as, and spec.kee. as. es are f
<,he, cone,ociosi dec..eae is necessory encorporos d by refereace here.a.
(Ar,acharass are listed herrie.)
oneckeyd e
2 3. N OF ONTRACT /
/
27.UN.
TAT (5 OF M*1CA s
srV
,N!.W,
nr es n
(s+.e e er,e. a.a.s.d soyp
-, f is,e.e.. e. Cea.
.a pee
- 24. NAxe aND Trrta OF s:Gms (y,p,,r pr,e,;
25 eArt sicNrD
- 23. NAus or CONTs ACnNG Ortects < T sp, er pregs/)
l29. D ATE s>GNE v
Donald E. Burroughs I
790bO80: Qf "9
Partner U.s. GCnfEWLsf P a t N 14 NC. CfriC[s t,7 6 200., f e 26.lD6
NRC-03-79-129 Page 2 of 5 t
TABLE OF CONTENTS This Contract Consists Of:
1.
Cover Page 2.
Table of Contents 3.
Schedule Article I Scope of Work Article II Period of Performance Article III Payment Article IV Authorized Representative Article V Staff Engineer Article VI Key Personnel Article VII Dissemination of Contract Information Article VIII Order of Precedence Article IX General Provisions and Modifications
NRC-03-79-129 Page 3 of 5 Article I - SCOPE OF WORK The Contractor shall provide assistance to the Antitrust and Indemnity Group and the Office of the Executive Legal Director (Staff) of the Nuclear Regulatory Commission (NRC) pertaining to antitrust hearings for the South Texas Nuclear Generating Station, Units 1 and 2, (South Texas) and the Comanche Peak Steam Electric Station, Units 1 and 2 (Comanche Peak).
In particular, the Contractor will be required to undertake the following work:
(1)
Review documents provided by Staff and/or through Contractor's research efforts.
(2) Prepare answers (including supporting exhibits) to engineering questions that will be provided to the Contractor by the Staff.
This will include an initial draft response followed by a second draft response reflecting 5taff's verbal comments of the first response.
These questions and answers will be an initial effort by the Staff and the Contractor to develop expert engineering testimony for the South Texas and Comanche Peak antitrust hearing (s).
(3) Assist Staff in the taking of approximately four depositions of engineers or utility officials relevant to the antitrust hearing (s).
(4) Assist Staff in one or two field interviews of person (s) relevant to the antitrust hearing (s).
Article II - PERIOD OF PERFORMANCE The period of performance shall commence February 15, 1979, and end on May 30, 1979.
Article III - PAYMENT The Contractor shall be paid for services rendered by applying the hourly rate set forth in the B0A to the number of hours worked for each category of labor.
In addition, the Contractor shall be reimbursed at cost for all reasonable travel costs incurred in performance of his duties, and other miscellaneous costs including telephone, reproduction, etc.
Article IV - AUTHORIZED REPRESENTATIVE The following authorized representative will represent the Government for the purpose of this contract:
Mr. Argil L. Toalston
?
NRC-03-79-129 Page 4 of 5 The authorized representative is responsible for:
(1) Monitoring the Contractor's technical progress, including the surveillance and assessment of performance and recommending to the Contracting Officer any changes in scope or requirements, and (2) Authorizing the payment of vouchers for supplies / services required under the contract.
The Contracting Officer is responsible for directing or negotiating any changes in terns, conditions, or amounts cited in the contract.
Article V - STAFF ENGINEER For guidance from the Staff Engineer to the Contractor to be valid, it must:
(1) be consistent with the description of work set forth in this contract; (2) not constitute new assignments of work or change to the expressed terms, conditions, or specifications incorporated into this contract; (3) not constitute a basis for an extension to the period of performance of contract delivery schedule.
Article VI - KEY PERSONNEL The personnel specified below are considered to be essential to the work being performed hereunder.
Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program.
No diversion shall be made by the Contractor without the written consent of the Contracting Officer:
Provided, that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause.
The attachment of this contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate:
Name Mr. Robert Hartley Mr. Ronald G. Wasson Article VII - DISSEMINATION OF CONTRACT INFORMATION The Contractor shall not publish, permit to be published, or distribute for public consumption, any information, oral or written, concerning the results or conclusiocs made pursuant to the performance of this contract, without the prior written consent of the Contracting Officer.
(Two (2) copies of any
URCd3-79-129 Page 5 of 5 ma'terial proposed to be published or distributed shall:be submitted to the Contracting Officer).
Failure to comply with this clause shall be grounds for termination of this contract.
Article VIII - ORDER OF PRECEDENCE In the event of an inconsistency between the terms and conditions of this contract, the inconsistency shall be resolved by giving precedence in the following order:
1.
The Schedule:
(Note - Nothing contained in the Contractor's proposal, whether or not incorporated by reference, shall constitute a waiver of any terms of conditions provided in the Schedule).
2.
The General Provisions 3.
Other terms and conditions of the contract, whether incorporated by reference or otherwise.
Article IX - GENERAL PROVISIONS AND MODIFICATIONS The following General Provisions attached to the Basic Ordering Agreement awarded to R. W. Beck and Associates, Inc. and referenced below form a part of this contract and are modified as set forth below:
a.
General Provisions for Time and Material or Labor Hour Contract b.
Appendix A, General Provisions, Fixed Price Technical Assistance Contract:
1.
Clause No. 's 2, 3, 5, 10, 11, 23, 30, 39, 40, 49 and deleted in their entirety.
2.
The following clause No. 23 entitled, " Disabled Veterans and Veterans of the Vietnam Era" (FPR Temp. Reg. 39) by this reference is substituted in lieu thereof.