ML19303B243
| ML19303B243 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 07/21/1982 |
| From: | John Kramer Office of Nuclear Reactor Regulation |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| CON-WNP-0530, CON-WNP-530 NUDOCS 8208030734 | |
| Download: ML19303B243 (1) | |
Text
i n
e DISTRIBUTION
(
DMB (50-397)
PTRB Reading Docket No. 50-397 HLThompson DLZiemann i
HBClayton JUL 21 1982 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing Division of Licensing FROH Joel J. Kramer, Deputy Director Division of Human Factors Safety
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION REPORT INPUT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM, UNIT 2 OPERATING AND MAINTENANCE PROCEDURES AND ANTICIPATED TRANSIENTS WITHOUT SCRAM Our SER of February 4,1982, contained inputs for TMI-2 related requirements for Emergency Operating Procedures I.C.1 - Short-Term Accident Analysis and Procedures Revision, I.C.7 - NSSS Vendor Review of Procedures, and I.C.8 -
Pilot Monitoring of Selected Emergency Procedures for Near-Term Operating License Applicants and for Section 15.8 - Anticipated Transients Without Scram. There have been no changes in the status of our review that should be addressed in Supplenient #2 ~of the SER.
This revien is being performed by R. J. Urban of the l'rocedures and Test Review Branch.
The reviewer is not aware of any " Differing Professional Opinions" for the review of Operating and Maintenance '/gocedures.
[;
l Original signed Dy,
- 3 g
- Joel J. Kramer, Deputy Director Division of Human Factors Safety l
cc:
A. Schwencer l
R. Auluck S. Sun 8208030734 820721 CF ADDCK 05000397 CF 3
DHFS:PTRB DHFS:PTRB DH A/DIlt Dllf4:D/DIR omer > DHF :PTRB HBClayton$.
,7, v...
.3 DL7iemann RF ez JJKramer Suamm > RJUrban:ah
=> 7./.t.*(../. 82 71.l}./.82
. 7/..f.(.82 7/)D/82 7/bl$82 eme,ow aio no.coi m.cu ono OFFICIAL RECORD COPY
- " *-32"2*