ML19302D313
| ML19302D313 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/09/1988 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML19302D314 | List: |
| References | |
| SL-4275, NUDOCS 8803180269 | |
| Download: ML19302D313 (2) | |
Text
Georgia Power Company 333 Pedmont Aenue Manta. Georgia 30308 le6ephore 404 526 6526 Maang Address Post ONce Box 454s Atla na, Georg.a 30302 Georgia Power L. T. hm ID' 300'*'" '#C 8 f3
Manager Nuolear Safety and Lcensing SL-4275 0810m X7GJ17-V600 Harch 9, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.
20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 RADIAL PEAKING FACTOR LIMIT REPORT Gentlemen:
In accordance with Technical Specification 6.8.1.6, Georgia Power Company submits in the enclosure a revised Radial Peaking Factor Limit Report for Cycle 1 operation of Plant Vogtle Unit 1.
Submittal of this revised report is necessitated by the implementation of an administrative F0 limit of 2.25 as discussed in our letters SL-4065 (1/29/88) and SL-4072 (1/29/88).
The revised Fo and radial peaking factor limits were implemented on February 9, 1988.
The enclosure also contains a revised elevation dependent peaking factor versus core height figure which is submitted in support of the subject report.
Please contact this office if you have any questions.
Sincerely,
- 4%
L. T. Gutwa JH/Im
Enclosure:
Radial Peaking Factor Limit Report c(w): Georaia Power Comoany Mr. P. D. Rice AnOi Mr. G. Bockhold, Jr.
F GO-NORMS g
U. S. Nuclear Reaulatory Commission Dr. J. N. Grace, Regional Administrator Ot4AAT d f Mr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies) dog C
Mr. J. F. Rogge, Senior Resident Inspector-Operations, Vogtle u
p)0 IC 8803180269 880309 Ipg I
C PDR ADOCK 05000424 p