ML19301D775

From kanterella
Jump to navigation Jump to search
Forwards Draft SER for Comments & Concurrence.Draft SER Provides Baseline Record of NRC Review in Event Const Reinstated.Comments Requested by 850920.W/o Encl
ML19301D775
Person / Time
Site: Satsop
Issue date: 09/04/1985
From: Novak T
Office of Nuclear Reactor Regulation
To: Bosnak R, Houston R, Johnston W
Office of Nuclear Reactor Regulation
References
CON-WNP-1379 NUDOCS 8512270195
Download: ML19301D775 (2)


Text

pa atuo

'o UNIT ED ST AT Es

[

),

NUCLE AR REGULATORY COMMISSION

).

3

? C WASHING T ON, D. C. 20M6

\\.... f

!;lUf/;

+

f. opj' ~

Docket No.: 50.412' MEMORANDUM FOR: Those on Attached List FROM:

Thomas M. Novak, Assistant Director for Licensing Division of Licensing

SUBJECT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM NUCLEAR PROJECT NO. 3 (WNP-3) DRAFT SAFETY EVALUATION REPORT The enclosed Draft Safety Evaluation Report (DSER) for WNP-3 is forwarded to you for your comments and concurrence. This DSER was originally scheduled to be issued in February 1984. Since all construction has been stopped, this draft SER is intended to provide a baseline record of the staff review in the event construction is reinstated. The applicant requested that the DSER issuance be withheld until review of certain additional items cculd be included.

The additional items were received as their resources would permit. The document being circulated represents our review of information received through August 1985.

If you or your staff are aware of staff positions that have changed significantly since the February 1984 to August 1985 time frame, we request your identification so that we may advise the applicant in the transmittal letter that those items may require reconsideration when the licensing process is reinstated.

We would appreciate your review and comments by September 20, 1985.

If that schedule is not possible please advise B. K. Singh (X28423).

h ts Thomas M. Novak, ssistant Director for Licensing Division of Licensing

Enclosure:

As stated CONTACT:

B. K. Singh X28423 UJ M hwwdu FMQ t; APPROVED y

elchd kyt 191 l'1 Er[ n nn,a NLawk m*#

/

0512270195 850904 CF ADOCK 0500 08

ADDRESSEES Robert J. Bosnak, Acting Assistant Director for Components and Structures Engineering Division of Engineering William V. Johnston, Assistant Director for Materials Chemical & Environmental Technology Division of Engineering Robert W. Houston, Assistant Director for Reactor Safety Division of Systems Integration Lester S. Rubenstein, Assistant Director for Core and Plant Systems Division of Systems Integration Dan Muller, Assistant Director for Radiation Protection Division of Systems Integration (Don!H'. Beckhamr Acting Deputy Director Division of Human Factors Safety