ML19297G966

From kanterella
Jump to navigation Jump to search
Minutes: Maine Impep MRB Meeting October 10, 2019
ML19297G966
Person / Time
Issue date: 10/10/2019
From:
Office of Nuclear Material Safety and Safeguards
To:
Johnson R
References
Download: ML19297G966 (4)


Text

MINUTES: MANAGEMENT REVIEW BOARD MEETING OF MAINE OCTOBER 10, 2019 The meeting attendees were as follows:

Management Review Board John Lubinski, NMSS, MRB Chair James Grice, OAS Representative (CO)

Adam Geneldman, OGC Kevin Williams, NMSS Scott Morris, Region IV IMPEP Team Dr. Lizette Roldan-Otero, NMSS/MSST Monica Ford, Region I Maria Arribas-Colon, NMSS/MSST Brian Goretzki, State of Arizona State of Maine Jay Hyland Tom Hillman Staff Michael Layton, NMSS/MSST Jazel Parks, NMSS/MSST James Trapp, RI Thomas Lancaster, NMSS/MSST Paul Michalak, NMSS/MSST Joe OHara, NMSS/MSST Robert Johnson, NMSS/MSST John Thorp, NRC/OIG Duncan White, NMSS/MSST Janelle Wiggs, NRC/OIG John Miller, RI Members of the Public James Grice, CO Jeff Dauzat, LA Phillip Peterson, CO David Crowley, NC Mike Stevens, FL Kevin Kunder, FL Terry Derstine, PA Topics discussed during the meeting included:

1. Convention. Mr. Robert Johnson convened the meeting at approximately 1:00 p.m.

(ET). He noted that this Management Review Board (MRB) meeting was open to the public, with an opportunity for public comment after the business portion of the meeting.

Introductions of the attendees were conducted.

2. Maine IMPEP Review. Dr, Lizette Roldan-Otero, Team Leader, led the presentation of the Maine Integrated Materials Performance Evaluation Program (IMPEP) review results to the MRB. She summarized the review and the teams findings for the indicators reviewed. The on-site review was conducted by a team composed of technical staff members from the U.S. Nuclear Regulatory Commission (NRC), and the State of Arizona during the period of July 22-26, 2019. A draft report was issued to Maine for factual comment on August 16, 2019. Dr. Roldan-Otero reported that the team found Maines performance was satisfactory for six indicators reviewed; and satisfactory, but needs improvement for Compatibility Requirements. The team also recommended that the recommendation from the 2015 IMPEP review under Compatibility Requirements should be closed, and the MRB unanimously agreed.

Maine MRB Meeting Minutes Page 2

3. Performance Indicators.

a) Dr. Lizette Roldan-Otero reviewed and presented the common performance indicator, Technical Staffing and Training. Her presentation corresponded to Section 3.1 of the proposed final IMPEP report. The MRB, the team, and Maine representatives briefly discussed the status of the staff hired during the review period and the impact of vacancies on the Agreement State Program.

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

b) Ms. Maria Arribas-Colon reviewed and presented the common performance indicator, Status of Materials Inspection Program. Her presentation corresponded to Section 3.2 of the proposed final IMPEP report. The MRB, the team, and Maine representatives briefly discussed inspection findings.

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

c) Dr. Roldan-Otero reviewed and presented the common performance indicator, Technical Quality of Inspections. Her presentation corresponded to Section 3.3 of the proposed final IMPEP report. The MRB, the team, and Maine representatives discussed the status of inspection activities.

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

d) Mr. Brian Goretzki reviewed the common performance indicator, Technical Quality of Licensing Actions. His presentation corresponded to Section 3.4 of the proposed final IMPEP report. The MRB, the team, and Maines representatives discussed the teams findings, as well as the actions the program had taken to address them. In addition, the MRB, recommended that the IMPEP team revise the IMPEP report to expand on some of the topics discussed (e.g.,

lack of maximum possession limits for industrial radiography licenses and implementation of Pre-Licensing Guidance).

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

e) Mr. Brian Goretzki reviewed and presented the common performance indicator, Technical Quality of Incident and Allegation Activities. His presentation corresponded to Section 3.5 of the proposed final IMPEP report. The MRB, the team, and Maine representatives discussed incidents of high risk and protecting allegers identities.

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

f) Dr. Roldan-Otero reviewed and presented the non-common performance indicator, Compatibility Requirements. Her presentation corresponded to Section

Maine MRB Meeting Minutes Page 3 4.1 of the proposed final IMPEP report. The MRB, the team, and Maine representatives discussed the States overdue regulations, and program elements, as well as the actions the program has taken to address them. In addition, the MRB, recommended that in the report, the team clarify which RATS IDs were overdue at the time of the review. The team agreed to modify to final report to include these amendments.

The team found Maines performance with respect to this indicator to be unsatisfactory.. With the exception of one MRB member, the MRB agreed with the teams recommendation. The sole dissenting voter did not agree with the finding of satisfactory, but needs improvement due to actions taken by the Program at the end of the review period.

g) Ms. Maria Arribas-Colon reviewed the non-common performance indicator, Sealed Source and Device Evaluation Program. Her presentation corresponded to Section 4.2 of the proposed final IMPEP report. The MRB, the team, and Maine representatives discussed the training and qualification of staff, including the updating of the training qualification journal.

The team found Maines performance with respect to this indicator to be satisfactory and the MRB unanimously agreed.

4. MRB Consultation/Comments on Issuance of Report. The team recommended, and the MRB unanimously agreed, that the Maine Agreement State Program be found adequate to protect public health and compatible with the NRC's program. The team recommended that the next IMPEP review take place in approximately 4 years with a periodic meeting in approximately 2 years. In addition, the team recommended and the MRB unanimously agreed that the recommendation from the 2011 IMPEP review be closed. The final report may be found in the ADAMS using the Accession Number ML19288A291.
5. Precedents/Lessons Learned. None
6. Comments from Members of the Public. None
7. Adjournment. The meeting was adjourned at approximately 2:30 p.m. (ET)

SUBJECT :

SUMMARY

OF OCTOBER 10, 2019 MAINE MRB MEETING ADAMS ACCESSION NO: ML19297G966 OFFICE MSST/SALB MSST/SALB MSST/SALB NAME JParks LRoldan-Otero RJohnson DATE 10/23/19 10/24 /19 10/24/19 OFFICIAL RECORD COPY