Text
r 8
1.-
PO9^n*
^ o cLEiEtA *. O C " o 4 4 '
e
? E s t G C '. E fr.
.a e
h t t y N A T *. c, e, c G e = = pt n,,ic sov a n E 5.r Da!wyn R Davidson
_tzm m.
- sswi, m. 4.: c.
o-a cs January 28, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Connission Washington, D. C.
20555
Dear Mr. Denton:
RE:
PERRY NUCLEAR PO'2R PLANT DOCKET NOS. 50-440, 50-441 Enclosed is forty (40) copies of Revision 1 to the Perry Nuclear Power Plant Fire Protection Evaluation Report.
This revision replaces in its entirety the original Perry Fire Protection Evaluation Report dated September 1977, previously subritted to your office.
This report is used a reference in Section 9.5-1 of the Perry Final Safety Analysis Repcrt.
as Very truly yours, o
fQ ff.
- n k.
/)s ? JOq Dalwy R. Davidson Vice President Systen Engineering and Construction DRD: kin Enclosure cc:
G. Charnoff r
V g,
I 3ool 1
/