Lists Actions Outlined in NRC Re Receipt of Reactor Fuel Under License SNM-1823 Which Have Been Completed.Water Hoses on Reactor Bldg Refueling Floor Are Valved Off & Safety Tagged.Emergency Drill Completed
ML19296D772
Person / Time
Site: Zimmer, 07002838
Issue date: 08/14/1979
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
13822, NUDOCS 8003130158
Download: ML19296D772 (2)


Text

-J ~ %.--

@ Doewff9/c 70-2esr>

4 m -;y].

m m,,

Id!.j,..n]

p.

g' c

dv 0

~

D THE CINCINNATI GAS & ELECTRIC COMPANY "TT "--

cincissanomo 4szoi

.7'

/ [\\ F '--

s 2

hf"f D

^

E. A. DORGMANN g

..e..................

w -.

- r i'i u g,. 'l August 14, 1979 Reference No. 070-2838 L:

. :.. 3 C-1 L' 1 !ECT;c,st United States COCW CLEI'

[

~~

Nuclear Regulatory Commission j(J/

/

/>

\\(9 Division of Fuel Cycle and gh'.

f Material Safety NECayE9 t., \\

%jl!

Uranium Fuel Licensing Branch Washington, D.C.

20555 1;

AUO ! 6,:g79 y v s, n,,.,

Attention:

Mr. W. T.

Crow, Section Leader

\\'

/

Uranium vrocess Licensing Section h\\ u[(

- ~/

\\jfef%

RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION -

UNIT 1 - NRC MATERIALS LICENSE NO.

SNM-1823 Gentlemen:

As we u.scussed with Mr.

W.

T.

Crow yesterday, the following actions which were outlined in your August 7 letter regarding receipt of reactor fuel at the Zimmer site under NRC Materials License No. SNM-1823 have been completed:

1.

CG&E has completed inspection and has accepted jurisdiction of the fuel storage area from the Henry J.

Kaiser Company.

2.

Water hoses on the reactor building refueling floor are valved off and safety tagged, and are now under the control of the shift supervisor.

3.

A waterproof, fire-resistant polyethylene cover, reinforced with nylon webbing has been received and will be used to protect the new fuel from moderation in the spent fuel pool.

4.

An emergency drill, assuming a dropped fuel assembly onto the refuelling floor, was completed yesterday.

5.

The Industrial Security Program provided by the attachment to your August 7 letter is in ef fect ;

however, as we discussed with you, the main access portal is at the southeast corner of the area instead of the southwest corner referenced in part i of the attachment to your August 7 letter.

rEE 7 rggg?

soosisosg t

u n uu 128xz v

afgs,

To:

United States August 14, 1979 Nuclear Regulatory Commission Re:

Wm. H.

Zimmer Nuclear Power Station -

Page #2 Unit 1 - NRC Materials License No.

SNM-1823 The above items are available for your inspection and we understand that a Rcgion III inspector will be here today.

Your prompt notification of approval permitting the applicant to receive the nuclear fuel will be appreciated.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. BORGMANN Senior Vice President EAB: dew 13872

&~ ~ -- -

& OocKef&fc 70~.280V

.. n.3m.m de# 4 4 [ Cf

~

u T":x "

u 9

THE CINCINNATI GAS & ELECTRIC COMPANY CIN OIN N AR QMIO 4 5 2OI d

/-

c '.

].

7- 'c.

c. 4. somosau s

..c....................

Eeference No. 070-2838

W t.
; 3 '. l August 14, 1979
y.. /,[hEk

,q s i l /.;,

Cd$dj E

United States Nuclear Regulatory Commission

%,/

/p Ycx Q

Vfg Division of Fuel Cycle and

//~.

g - g'.

s Material Safety NEC.9/tg f,. i Uranium Fuel Licensing Branch C

AUG 16 g79 y -jli Washington, D.C.

20555

/-

u, s, m.,

\\m@j\\ ~p "

Attention:

Mr. W. T.

Crow, Section Leader

./

Uranium Process Licensing Section 4

'km RE:

WM. H.

ZIMMER NUCLEAR POWER STATION -

UNIT 1 - NRC MATERIALS LICENSE NO.

SNM-1823 Gentlemen:

As we discussed with Mr. W.

T.

Crow yesterday, the following actions which were outlined in your August 7 letter regarding receipt of reactor fuel at the Zimmer site under NRC Materials License No. SNM-1823 have been completed:

1.

CG&E has completed inspection and has accepted jurisdiction of the fuel storage area from the Henry J. Kaiser Company.

2.

Water hoses on the reactor building refueling floor are valved off and safety tagged, and are now under the control of the shift supervisor.

3.

A waterproof, fire-resistant polyethylene cover, reinforced with nylon webbing has been received and will be used to protect the new fuel from moderation in the spent fuel pool.

4.

An emergency drill, assuming a dropped fuel assembly onto the refuelling ficor, was completed yesterday.

5.

The Industrial Security Program provided by the attachment to your August 7 letter is in effect ;

however, as we discussed with you, the main access portal is at the southeast corner of the area instead of the southwest corner referenced in part 1 of the attachment to your August 7 letter.

I MbM

  1. 3

r To:

United States August 14, 1979 Nuclear Regulatory Commission Re:

Wm.

H.

Zimmer Nuclear Power Station -

Page #2 Unit 1 - NRC Materials License No.

SNM-1823 The above items are available for your inspection and we understand that a Region III inspector will be here today.

Your prompt notification of approval permitting the applicant to receive the nu61 ear fuel will be appreciated.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E.

A. BORGMANN Senior Vice President EAB: dew 138Z2