Forwards Decontamination Plan Proposed in . Proposed Schedule of 300 Working Days Dependent on Availability of EPICOR-II Processed Water for Flushing Sys, Tanks & Components & Absence of Contaminant Plating
ML19296D736
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/29/1980
From: Wilson R
METROPOLITAN EDISON CO.
To: Jay Collins
NRC - TMI-2 OPERATIONS/SUPPORT TASK FORCE
References
TLL-043, TLL-43, NUDOCS 8003130091
Download: ML19296D736 (2)


Text

M JhGUbh,. out,a1d... COPY n...

t Metropolitan Edison Company Post Office Box 480

}

Middletown, Pennsylvania 17057 717 944-4041 Writer's Dnect Deal Number February

, 1980 TLL 043 TMI Support Attn:

J. T. Collins, Deputy Director U. S. Nuclear Regualtory Commission c/o Three Mile Island Nuclear Station Middletown, Pa.

17057

Dear Sir:

Three Mile Island Nuclear Station, Unit II (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Proposed Program for Auxiliary Building Sump and Associated Tanks Decontamination Enclosed please find the Decontamination Plan discussed in our letter dated December 21, 1979, GQL 1509 (Item #13).

The Auxiliary Building sump and associated tanks decontamination will take place over the remainder of 1980.

The internal decontamination of these tanks and sump will be performed in accordance with approved procedures that will be submitted for NRC ' review and approval.

The proposed schedule for accomplishing this decontamination effort will require three hundred (300) working days to accomplish, based on logical steps-and manpower availablilty.

The schedule is dependent on the availability of EPICOR II processed water for flushing systems, tanks ar.d components and is a best case p1m. based on the assumption that no plating of contaminants has taken place in the tanks and that processed water flushing and filtering will remove all contamination.

The processed water is also needed to wash down exterior surfaces inside the tank cubicles prior to entry for tank decontamination.

With the exception of the Auxiliary Building sump and sump tank, the amount of decontamination required in the tanks will be determined as each system is finshed and an internal inspection of the tank has been accomplished.

This internal inspection will determine the extent of residual contaminatian, remaining inside, that must be removed.

It is presently planned to circulate the tank water through filters to remove the tank residuals.

The system and the operating techniques used will be supported by approved procedures.

8003130 M l Metropohtan Edison Company rs a Member of the General Pubhc Uhltes System

,/

, Februa ry 1980 TLL 043 The proposed schedule for decontaminatidn of the Auxiliary Building sump and issociated tanks, is attached.

1 Sfneer9 y,

/(

1%

R. F. Wi son Director, TMI-II RFW:LWil: hah Enclosure cc: