ML19296D654

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-25.Response to IE Bulletin 76-02 in 1976 Indicated That Relays Were Not in Use at Facility. Relays Not Installed Nor Planned for Installation
ML19296D654
Person / Time
Site: Rancho Seco
Issue date: 11/26/1979
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-25, NUDOCS 8003120697
Download: ML19296D654 (1)


Text

/ w-SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 November 26, 1979 4

l.

REcDVE0 :r 5 1979 [

Docket tio. 50-312 i.

DEC

]h\\

-4 H

N Iliil \\'O I!r.

R.

II. Engelken, Director

~/

U. S. Nuclear Regulatory Comuission Region V Of fice of Inspection and Enforcement 1990 North Californii. 6 tvd.

'.Ja l nu t Creek, CA 94596 Re Rancho Seco Unit No.

1, in Bulletin 79-23

Dear Mr. Engelken:

IE !?ulletin 79-25 requirer, facilities with an operating license to take certain actions regarding Uestinghouse type BFD/::BFD relays used or planned for use in safety-related systems.

An investigation of sa fety-related equipment for usage of these Westing-house relays was conducted in 1976 in connection with IE Circular 76-02.

UFD/NBFD relays in use in safety related equip-At that time there were no ment.

Since the investir,ation was conducted, no new cafety related equip-ment has been put in ';crvice using BFD/NBFD relay:, and there are no plans to install any such equipp;ent in the future, please let us know if we can be of further assistance.

Sincerely, h

}LL)

&L i

. v.. !!attimoe, Assistant General :!anager and Chief Engineer JJM:CI:ma c: Office of Inspection & Enforcement Washington, D.C.

80031206q7 AN i(F:

fC ' Y'.,ff M 3ERVING
  • ! 0 R E IHAN 6 0 0,0 0 J IN THE HEART Of CAtil0RNiA 1 c? Q9 -

,x