Interim Deficiency Rept Re Nonseismic Equipment Installed Over Seismic Equipment.All Affected Equipment Identified in Reactor & Auxiliary Bldgs.Final Rept Will Be Submitted by 800614
ML19296D395
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/14/1980
From: Fahrner W
DETROIT EDISON CO.
To:
References
EF2-48062, NUDOCS 8003040518
Download: ML19296D395 (2)


Text

'

4 Deiroit ECliSOn ECMi?-

February 14, 1980 EFP-4 8062 Mr. James C. Keppler, Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Coninission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) on Non-Seismic Equipment Installed over Seismic.

Dear Mr. Keppler:

On January 18, 1980, Detroit Edison's Mr. R.W. Barr, Project Ouality Assurance Director, telcohoned Mr. J. Conklin of NRC Region III to report on non-seismic equipment inscalled over seismic equipment at the Fermi 2 Site.

To date, all affected equipment has been identified in the Reactor and Auxiliary Buildings.

Edison Engineering continues the review of this problem and a final report will be submitted to you by June 14, 1980.

If you have any questions on this matter, please contact Mr. H.A. Walker, Site Project Quality Assurance Engineer.

Sincerely,

.. ji.j-) kW GW W.J. Fahrner Project Manager Enrico Fenni II cc:

Mr. John G. Davis, Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Coninission Washington, D.C.

20555 s

80030 405IS

s Mr. James G. Keppler February 14, 1980 Page Two EF2-48062 bcc:

T.A. Alessi/U.G. Orlando C.R. Bacon J.G. Bolt W.F. Colbert T.H. Dickson W.M. Everett F.E. Gregor Edward Hines P. A. Marquardt/ Docket File (2)

E.H. Newton L.E. Schuerman M.G. Sigetich W.M. Street H. Tauber H.A. Walker W.W. White Document Control 50.55(e) File G.W. Richards