Requests Emergency Amend to Commission 791130 Confirmatory Order,So That Unit 1 Can Remain in Svc,Until 800310,due to Unit 2 Shutdown Caused by 800227 Secondary Leakage in Excess of Tech Spec Limit
ML19296D340
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/28/1980
From: Charnoff G
SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8003030536
Download: ML19296D340 (3)


Text

.

a .

SH Aw, PITTMAN. PoTTs & TROWB RIDGE -

18 0 0 M STR E ET, N. W.

WASHINGTON, D. C,20036 pAMSAr D POTT S ST E PM E N 9 M UTTLE n (2021 J3e A*00 cTEvan' L piTTMAN wiNTMaop N enO*4 _

oEonot F TRO*smico, ;AMES eMAMum STEPMEN D POffS NOBE nf E 2AMLER v g g g co pi g n NLLIP o "eOS"TNCa b e"E n t e acesUNS (202) 296 069A & 296 i?SO m TeMOTMrMANto4 STEVEN M tuCAS _

GEOmOE M. noo E mS. J a. M AT AS F TsavitsO. oiAz JOMN 8 mMIN E LA N C E m vlCTCasa J. PE mMINS TELEN

!ESLf!INICMOLS .Jm. 7 ."PS SS &G9 3 ( SM AwLAW wSM)

" CE ***'#

"eCM$ oJ YNoALL NMOT N M emioE JAv E. SILgEmo E Le S A B ETM M ptNOLETON ~

SAMSARA M NOSSOTTl LUCT G E LI A SOP GEONOC V. ALLEN. Je PAu L 4. M A PLA N EDwARO S. CPOSLAND wM emacromo mErNOLCS Mamme M.OLASSp4EGEL coygggt FmED A. LeTTLE TMOM AS M. McConMsCR FmED OmaSNEW SUSAN O.FALASON N ATM ANeEL P G R E E O. J m. wlL6f AM P Sama Mamm AUG EN B LeC R JOM N L. Camm, Jm.

E nh E ST L. BLA N E, Ja. PM c Li p J.MAnvET CAmLETON S. JON ES mosERT M. GomoON YMOM AS A. gamTEm JAM ES M .umoEn .JAm E AN.N A.ECALCE MON.

ANAJ.MomoEN S HE LOON J. wEiS EL sONNIE S. GOTTL8 E 8 JOMN A.McCuLLouGM ALFmED M POSTELL J, PAT RIC M MsC R EY SETM M MOOG A S a A N JAM ES TMOM AS LENMART SMEILA C.McCAFFERTY STEVEN L. M ELT2 Em C E LI S S A A, miOGway OEAN O. AuLaCM MENNETM J. MauTMAN JOHN ENGEL CAVlQ LAwmENCE MILLEn

. M., A.M ,m. i M o c.

February 28, 1980 Mr. Harold R. Denton Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Wisconsin Electric Power Company Point Beach Nuclear Plant, Unit 1 Docket 50-266

Dear Mr. Denton:

By Confirmatory Order for Modification of Licensc, dated November 30, 1979, the Nuclear Regulatory Commission provided, in Section IV(1) (b) , for the conduct in Point Beach Nuclear Plant, Unit 1, of primary to secondary and secondary to primary hydrostatic tests and for an eddy current examination of the steam generator tubes to be performed within sixty effective full power days from the date of issuance of the Order. That period of time will expire on Friday, February 29, 1980. Wisconsin Electric Power Company was planning to remove Unit 1 from service for this purpose this evening, February 28th.

In the evening of February 27, 1980, a primary to secondary leakage rate approaching the Technical Specification

\

% g vo

\

9

+

+

8003030 gq

SHAW. PITTMAN, POTTS & TROWBRIDGE Mr. Harold R. Denton February 28, 1980 page two limit of 500 gpd was detected in Point Beach Nuclear Plant, Unit 2. The plant operating staff immediately proceeded to shut down Unit 2. By the time the unit was removed from service, the leakage rate was approximately 1400 gpd. Unit 2 will remain shut down until the source of the leakage is detected and appropriate plugging is accomplished, as required by the Technical Specifications.

It was Wisconsin Electric Power Company's intention to shut down Unit 2 at the end of March for refueling and turbine generator inspection. Present intentions are to perform inspections and repairs and return Unit 2 to service promptly. Unit 2 shutdown for scheduled refueling will be deferred from its original date of March 28 to April 11.

Since Unit 1 returned to service on December 23, 1979, the measured primary to secondary leakage has been maintained at a steady, low level of about 30 gpd, suggesting that the deterioration of the steam generator tube may have been arrested. This, of course, will be checked in more detail at the forthcoming eddy current inspection.

As a result of the event at Point Beach Unit last night, Wisconsin Electric Power Company hereby requests an emergency amendment of the November 30, 1979, Confirmatory Order to allow Unit 1 to remain in operation for an additional ten effective full power days beyond March 1, 1980, prior to the conduct of the tests required under Section IV(1) (b) of the November 30th Confirmatory Order.

In light of the steady and low leakage rate experienced at Unit 1 of 30 gpd during the last two and one-half months, this extension should present no undue risk to public health and safety.

To the extent that this requested extension would require prior notice to the Commissioners, I should appreciate it if you would bring this to the attention of the Commission at its meeting scheduled for this afternoon.

Respectfuldy sub tted,

'E % , /

Gerald Charnoff Counsel for Wisconsin Ele [c[tric Power Company cc: Service List

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION In the Matter of )

)

WISCONSIN ELECTRIC POWER COMPANY ) Docket 50-266

)

(Point Beach Nuclear Plant, ) (Modification of Unit 1) ) License)

SERVICE LIST Mr. Darrell G. Eisenhut Kathlcen M. Falk, Esquire Office of Nuclear Reactor Regulation Wisconsin's Environmental U. S. Nuclear P.egulatory Commission Decade, Inc.

Washington, D. C. 20555 114 East Mifflin Street Madison, Wisconsin 53703 Mr. Samuel J. Chilk Secretary Docketing and Service Section U. S. Nuclear Regulatory Commission Office of the Secretary Wasington, D. C. 20555 U. S. Nuclear Regulatory Commission Marian E. Moe, Esquire Washington, D. C. 20555 Office of General Counsel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Edwin J. Reis, Esquire Office of Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Lewis T. Mittness Executive Secretary Public Service Commission of Wisconsin Hill Farms State Office Building 4802 Sheboygan Avenue Madison, Wisconsin 53702 C. F. Riederer, P. E.

Public Service Commission of Wisconsin Hill Farms State Office Building 4802 Sheboygan Avenue Madison, Wisconsin 53702 6