ML19296D124

From kanterella
Jump to navigation Jump to search
Forwards LER 80-005/03L-0
Date released: 11/06/2019 Download: ML19296D124


LER 80-005/03L-0:on 800122,five Channel B Trip Units Were Bypassed Due to Spurious High Power Levels.Caused by Noise from Excore Nuclear Instrument Upper Subchannel Detector. Troubleshooting Planned for Next Cold Shutdown
ML19296D129
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/22/1980
From: Heibel R, Rizzo P
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19296D129 (2)
Forwards LER 80-005/03L-0
ML19296D122
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 02/22/1980
From: Russell L
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19296D122 (1)