ML19296C777
| ML19296C777 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 02/15/1980 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19296C778 | List: |
| References | |
| NUDOCS 8002280366 | |
| Download: ML19296C777 (1) | |
Text
B ALTIMORE G AS AND ELECTRIC COMPANY P.O. B O X 1475 B A LTIM O R E M A R Y L A N D 2120 3 ARTHUR C. LU N OVALL,.)R.
February 15, 1980 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D. C.
20555 ATTENTION:
Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors
SUBJECT:
Calvert Cliffs Nuclear Pcwer Plant Unit No. 2, Docket Number 50-318 Reactor Containment Building Integrated Leakage Rate Test Report
REFERENCE:
(1) 10 CFR 50, Aopendix J Gentlemen:
A successful periodic reactor containment building integrated leak rate test, in accordance with Reference (1), was performed on November 15, 1979 on Unit No. 2.
Twelve copies of this test report are herewith forwarded for your review, as required by Section V of Reference (1).
Appendix Q, of subject report, contains the failed test report as required by Refer-ence (1). Since the initial attempt of the Type A test failed to meet the acceptance criteria in III.A.5.(b) of Reference (1), the test schedule ap-plicable to subsequent Type A tests will require approval by the Commission.
Very truly yours,
/
,~
j
/
,/
L 'A. E.' Lundvall, Jr.iM~ w.w 7 Vice President - Supply 5
AEL/BCR/nlb 0
Enclosure 9\\p
\\
8 0 0 22 8 0.3 (o fo