05000259/LER-1980-007-03, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed

From kanterella
(Redirected from ML19296C558)
Jump to navigation Jump to search
/03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed
ML19296C558
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/22/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19296C556 List:
References
LER-80-007-03L, LER-80-7-3L, NUDOCS 8002260642
Download: ML19296C558 (2)


LER-1980-007, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed
Event date:
Report date:
2591980007R03 - NRC Website

text

o..... m n o e ~,. o.,. ~........

.napFORr.tses LICENSEE EVENT REPORT CONTROL BLOCK:

l l

l l

l lh (PLEASE PRINT OR TYPE ALL REos.IIRED INFORMATION) lAlLlB R I F l 1 }@I O l 0 l - l 0 l 0 l 0 l 0 I n l -l 0l 0l@l 4l 1l l} 1l 1l@l l

l@

14 15 LICENSE NuYSER 25 26 LICENSE TveE Jo SF CAT 5d o

i 7

8 9 LICENSEE CODE oI' 5c,'f,"', l L l@[ 0 l 5 D l 0 l 0 l 2 l 5 l 9 @l 0 l 1 l 2 l5 810l@lOl212! ?l 81 CCN'T 68 63 EVENT OATE 74 Is REPGRT O ATE 80 60 61 COCKET NuY8ER 7

4 EVENT DESCRIPTION AND PRC8ABLE CONSEQUENCES h o12 l During refueling outage while performing SI 4.2.A-16 " Calibration Reactor Building l

o a i Isolation and/or Logic Timers (Refueling Zone and Reactor Zone)" isolation relay

[

iso-1 o

4 l " RIB" was found to be sticking part of time resulting in "B" logic channel not o13) I lating. Reference T. S. 3.2.A.

No significant resulticg events, no danger to health [

o 16 l or safety of public. Channel "A" was available. No previous occurrences.

l I

Ol7 l

l 0l3 l

dJ COMP VALVE SYSTE M

CAUSE

CAUSE CCCE CoCE SLSCOCE CCVeUNENT CODE SUBCCOE SuaCODE l Al A lh y@ lB lh lRlElLlAIYlXlh [J_lh W h Ol" 7

4 9

10 i1 12

'J 18 19 2)

REVISION

  • ECUENTI AL OCtuR R E P.CE A E PC A T EVENT YE AR REPCRT NO.

CCOE TYPE NO.

h,A's" g lJ18l 0l

[__J 0 l 0l 7l l/]

lql,l lL l b

l0 l LERAO 22 23 24 26 21 28 23 30 31 32 u

ATT ACHM ENT NP R O.4 PRIVE COMP.

CoMPCNENT ACTfoN SUTURE EF8ECT SHUTOc.NN SU8 MITT ED FORM sus.

SUPPU ER MANURACTURER T AP.E N ACTION CN PLANT VETHOD NoVRS l C fglJ4Zl@

l Z l@

l Z l@

l0l0l0l0 W@

IN l@

lLl@

l A l 1 l 0 l 9 l@

+4

~

33 JS 36 37 40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i

o l Relay RlB, Agastat, TDDO Model 7022AB. was stickine resultine in time Ael,v co r,* s I l1 J1 l l remainine closed af ter relav deenergization and tire out. Relov was rea1,ceA

,n d I

,,> } SI 4.2.A-16 completed. No recurrence control required. FHinre v,9 r, n k, in i

I i ; 3

{ nature.

I i

4 I

so 7

8 3 ST S

% POWER oTHE9 STATLS Dis C RY OfSCOVERY CESCRIPTroN NA l

l B l@l Electrician found during test.

l s i [_Hj@ l Oi 0 l 0 l@l i

A/TiviTY Co$ RENT AucuNT CF ACTiv4TY h l toCATICN OF AELE ASE f

aEte.seO@craELEAsry@l l NA lZl NA t i6 PEnscNJiExPosui E

ES Nw e e.,

TYPE C E SC AiP TICN l

l0l0l0j@lZl@l NA 7

' PEnscNNe't iN;u3e5 OESCaiPricNh l

Nuveea i I l0l0l0l@l NA 7

4 3 11 I2 L OSO 35 GR O AM AGE TO F AC:LITv l

TYPE C E SC Ai8 7lON

@l NA i

a

,a 4

l ll ll llilll ll ll esuE @CESCR?PTION hl NA lo 69 69 80 ;

J n J IQ 9

PHONE NAYE OF PREPARER [pJ 80o.: 2S0 4

Tennessee Valley Authority Form BF-17 Browns Ferry Nuclear Plant BF 15.2 1/10/79 LER SUPPLEMENTAL INFORMATION BFRO-50 259 / _8007 Technical Specification Involved 3.2.A.

Reported Under Technical Specification _6.7.2.b.2 Date of Occurrence _1/25/80 Ti:ne of Occurrence 1030 Unit 1

Identificadon and Descriptien_of Occurrence:

Wile performing " Calibration Reactor Building Isolation and/or Logic Timers" "B"

logic channel did not isolate.

Conditions Prio.r_to Occurrence:

Unit 1 @ 0% refueling outage.

Unit 2 @ 77%.

Unit 3 0 98%.

Action specified in the Technical Specification Surveillance Requirements met due to inoperable equipment.

Describe.

NA Apparent Cause of Occurrence:

Relay "RlB" was found to be sticking part of the time resulting in the time delay contacts remaining closed.

Analve.is of Occurrence:

There was no damage to plant equipment. There was no activity release, no personnel exposure or injury and no danger to health or safety of the public.

Corrective Action

The relay was replaced and SI 4.2. A-16 was completed.

p_ailure Data:

NA

  • Retention:

Period - Lifetime; Responsibility - Administrative Supervisor

\\