ML19296B784

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-001/03L-0 & 80-002/03L-0
Date released: 11/06/2019 Download: ML19296B784


LER 80-002/03L-0:on 800114,while Performing Surveillance Test,Hydrogen Purge Supply Isolation Valve CV-7448 Failed to Close.Caused by Oxidation on Torque Switch Contacts.Contacts Cleaned
ML19296B809
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/13/1980
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19296B809 (1)
LER 80-001/03L-0:on 800114,while Performing Surveillance Test,Hydrogen Purge Supply Isolation Valve CV-7444 Failed to Close.Caused by Oxidation on Torque Switch Contacts, Resulting in High Resistance to Closure.Contacts Cleaned
ML19296B792
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/13/1980
From: Branlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19296B792 (1)
Forwards LERs 80-001/03L-0 & 80-002/03L-0
ML19296B783
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/13/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT M V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19296B783 (1)