Rept Re Pipe Support Designs Exceeding Allowable Embed Loads Based on Partial Engagement.Written Rept Will Be Provided by 800201 Describing Investigation & Evaluations
ML19296B756
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/29/1980
From: Lex B
BECHTEL GROUP, INC.
To:
References
NUDOCS 8002210458
Download: ML19296B756 (2)


Text

- - s~

e u;s . .r ,

-an Bechtel Power Corporation r'!Rt.y PP,0Jbt

%'o Engineers - Constructors 12400 East trnperW Highway

.iii d'" 3 ) R13: N Norwalk, Cahfornia 90650 ,

MAIL ADORESS  !

P O 80x 60860 - TERMINAL ANNEX. LOS ANGELIS. CAUFORNIA 90000 i TELEPHONE (213) 86&6011 i

January 29, 1980 i

i Mr. Karl Seyfrit Director, Region IV Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

Subject:

Georgia Power Company Alvin W. Vogtle Nuclear Plant Bechtel Job 9510 Possible Significant Deficiency File X7BG03, Log BO 0002 U

tif

Dear Mr Seyfrit:

This letter confirms my telephone report to you made at 8:50 A.M.

Pacific Standard Time, January 29, 1980 on behalf of I. R. Caraco, Vice-President and Division Manager of Los Angeles Power Division of Bechtel Power Corporation concerning a possible significant deficiency we have discovered which may be potentially reportable under 10 CFR 21.

The nature of the deficiency is as follows:

The load capacity tables for embed plates were determined on the basis of full engagement area and no lateral loads.

Application of these tables in the design of pipe supports, in some cases, has been based on partial engagement and g has allowed lateral loads in some instances. It is possible o that some pipe support designs released for construction have exceeded the allowable embed loads based on partial engagement.

We expect to file a written report with you by Friday afternoon, February 1, 1980 covering the nature of the deficiency, our investi-gative and evaluative actions taken so far and our interim conclusions.

We will require 90 days to complete our detailed investigation of impact on the Vogtle project and our generic evaluation of other projects, after which we will submit a final report to you.

30/7 56 ll0 8002 210 4-SS

.' ,- Bechtel Power Corporation Mr. Karl Seyfrit Alvin W. Vogtle Nuclear Plant Bechtel Job 9510 Possible Significant Deficiency File X7BG03 Page 2 January 29, 1980 Georgia Power Company, the licensee for the Vogtle project, has verbally notified Inspection and Enforcement Region II (Atlanta) of this deficiency under the reporting requirements of 10 CFR 50.55 (e) .

It is our present intention to prepare our interim and final reports in a format which will fullfill any Bechtel reporting requirements under 10 CFR 21 and Georgia Power Company reporting requirements under 10 CFR 50.55 (e) .

Please furnish any copies of correspondence you may initiate to Mr. D. E. Dutton of Georgia Power Company or Mr. I. R. Caraco of Bechtel - Los Angeles regarding this report to this office.

Very truly yours, BECHTEL POWER CORPORATION B. L. L e 'x '~

Project Manager Los Angeles Power Division BLL/amt xc: D. E. Dutton C. W. Hayes J. A. Bailey