ML19296B724

From kanterella
Jump to navigation Jump to search
Advises That Employees W/Experience in Operation of PWRs Will Be Provided on Each Shift During Fuel Loading & Low Power Testing.Util Has Contracted for Westinghouse Employees to Support Special Test Program
ML19296B724
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/13/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Rubenstein L
Office of Nuclear Reactor Regulation
References
NUDOCS 8002210419
Download: ML19296B724 (1)


Text

~ INN _3IZ: Vs'_r'

-Co' 4

400 Chestnut Street Tower II February 13, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. L. S. Rubenstein, Acting Chief Light Water Reactor Branch No. 4 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Rubenstein:

In the Matter of the Application of

)

Docket No. 50-327 Tennessee Valley Authority

)

During fuel loading and low power testing, TVA will provide, on each shift, one or more employees with significant experience in the operation of pressurized water reactors. These employees will be on duty during fuel loading or whenever the plant average reactor coolant temperature le greater than 3500F or the reactor is critical.

TVA has contracted for Westinghouse employees to support the special test program. Westinghouse staff includes two nuclear operations engineers and one functional analysis engineer.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Mannger Nuclear Regulation and Safety F

800222o 4/9