U.S. NUCLEAR REGULATORY COMMISSION
>
OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
,
Report Nos. 50-546/79-28; 50-547/79-28
Docket Nos. 50-546; 50-547
License Nos. CPPR-170; CPPR-171
Licensee: Public Service of Indiana
1000 East Main Street
Plainfield, IN 46148
Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2
Inspection At: Region III office, Geln Ellyn, Illinois
Inspection Conducted: December 10, 1979
[ggfy'
/ /3 / 8 Q
Inspectors:
C. C. Williams, Chief
,
,
Projects Section 2
"I
F. C. Hawkins
(%"
l l 7. / OO
'
.
.
E. R. Schweibinz','
/ / 3 / 9;D
7d b w 'L h~~
Approved By:
G. Fiore11i, Chief
/
80
Reactor Construction and
Engineering Support Branch
Inspection Summary
Inspection on December 10, 1979 (Report Nos. 50-546/79-28; 50-547/79-28)
Areas Inspected: This was a special announced meeting to discuss the
development of the licensee's response to the " Order Conforming Suspension
of Construction" dated August 15, 1979, in the form of the Marble Hill
Construction Verification Program. This inspection involved a total of 20
inspector-hours at the RIII office by four NRC inspectors.
Results: No items of noncompliance or deviations were identified.
3N
8002
a
.
DETAILS
'
1.
Attendees
Public Service of Indiana (PSI)
,
J. Bott, Licensing Manager
T. R. Burns, Project Engineering Manager
S. K. Farlow, Special Projects Engineering Supervisor
Management Analysis Company (MAC)
R. E. Turner, Quality Assurance Manager
D. J. Ashley, Project Engineering Manager
NRC
G. Fiorelli, Chief, Reactor Construction and Engineering Support
Branch (RC&ESB)
C. C. Williams, Chief, Projects Section 2(RC&ESB)
F. C. Hawkins, Reactor Inspector
E. R. Schweibinz, Reactor Inspector
2.
Meeting
The meeting was initiated by PSI to present their planned and in-
process Construction Verification Program in response to the first
issue identified in the NRC " Order Confirming Suspension of Con-
struction", dated August 15, 1979.
These discussions focused on the PSI preliminary draft of the Con-
struction Verification Program. The program included a list of
items which address Safety Related work functions previously per-
formed on the site. The verification functions listed with each
item are to assure that all safety related construction work per-
formed is acceptable. Each item was discussed with the licensee
and the minimum acceptable requirements were clarified by the NRC
representatives.
Further meetings with NRC to discuss the licensee's progress regard-
ing the issues identified the August 15, 1979 order are planned.
3.
Item of Concern Raised by the Subcommittee on Environment, Energy,
and Natural Resources
During the hearing by the above subcommittee on November 27, 1979,
Mr. Moffett introduced into the record the Marble Hill Project Monthly
Quality Assurance Progress Report for May, 1977, dated June 16, 1977.
-2-
.
.
This report stated in part, " PSI has not yet issued a Purchase Order
or Letter of Intent to Newberg Marble Hill. Although all work has
been accomplished under the same conditions that would be expected
had the issuance been accomplished, undue criticism may be expected.
The potential for a possible Citation from the NRC, if discovered
during an audit, is greatly compounded ..."
,
This item was discussed at this meeting and further information, in
addition to that already provided by Mr. F. R. Hodges, was requested.
This item remains unresolved. (546/79-28-01; 547/79-28-01)
Unresolved Items
Unresolved items are matters about which more inf r ation is required in
order to ascertain whether they are acceptable items, items of noncom-
pliance, or deviations. Unresolved items disclosed during the inspection
are discussed in Paragraph 3 of the Details Section.
-3-
-