IE Insp Repts 50-546/79-28 & 50-547/79-28 on 791210.No Noncompliance Noted.Major Areas Inspected:Development of Licensee Response to Order Confirming Suspension of Const
ML19296B635
Person / Time
Site: Marble Hill
Issue date: 01/03/1980
From: Fiorelli G, Hawkins F, Williams C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19296B629 List:
References
50-546-79-28, 50-547-79-28, NUDOCS 8002210158
Download: ML19296B635 (3)


See also: IR 05000546/1979028

Text

(

U.S. NUCLEAR REGULATORY COMMISSION

>

OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

,

Report Nos. 50-546/79-28; 50-547/79-28

Docket Nos. 50-546; 50-547

License Nos. CPPR-170; CPPR-171

Licensee: Public Service of Indiana

1000 East Main Street

Plainfield, IN 46148

Facility Name: Marble Hill Nuclear Generating Station, Units 1 and 2

Inspection At: Region III office, Geln Ellyn, Illinois

Inspection Conducted: December 10, 1979

[ggfy'

/ /3 / 8 Q

Inspectors:

C. C. Williams, Chief

,

,

Projects Section 2

"I

F. C. Hawkins

(%"

l l 7. / OO

'

.

.

E. R. Schweibinz','

/ / 3 / 9;D

7d b w 'L h~~

Approved By:

G. Fiore11i, Chief

/

80

Reactor Construction and

Engineering Support Branch

Inspection Summary

Inspection on December 10, 1979 (Report Nos. 50-546/79-28; 50-547/79-28)

Areas Inspected: This was a special announced meeting to discuss the

development of the licensee's response to the " Order Conforming Suspension

of Construction" dated August 15, 1979, in the form of the Marble Hill

Construction Verification Program. This inspection involved a total of 20

inspector-hours at the RIII office by four NRC inspectors.

Results: No items of noncompliance or deviations were identified.

3N

8002

a

.

DETAILS

'

1.

Attendees

Public Service of Indiana (PSI)

,

J. Bott, Licensing Manager

T. R. Burns, Project Engineering Manager

S. K. Farlow, Special Projects Engineering Supervisor

Management Analysis Company (MAC)

R. E. Turner, Quality Assurance Manager

D. J. Ashley, Project Engineering Manager

NRC

G. Fiorelli, Chief, Reactor Construction and Engineering Support

Branch (RC&ESB)

C. C. Williams, Chief, Projects Section 2(RC&ESB)

F. C. Hawkins, Reactor Inspector

E. R. Schweibinz, Reactor Inspector

2.

Meeting

The meeting was initiated by PSI to present their planned and in-

process Construction Verification Program in response to the first

issue identified in the NRC " Order Confirming Suspension of Con-

struction", dated August 15, 1979.

These discussions focused on the PSI preliminary draft of the Con-

struction Verification Program. The program included a list of

items which address Safety Related work functions previously per-

formed on the site. The verification functions listed with each

item are to assure that all safety related construction work per-

formed is acceptable. Each item was discussed with the licensee

and the minimum acceptable requirements were clarified by the NRC

representatives.

Further meetings with NRC to discuss the licensee's progress regard-

ing the issues identified the August 15, 1979 order are planned.

3.

Item of Concern Raised by the Subcommittee on Environment, Energy,

and Natural Resources

During the hearing by the above subcommittee on November 27, 1979,

Mr. Moffett introduced into the record the Marble Hill Project Monthly

Quality Assurance Progress Report for May, 1977, dated June 16, 1977.

-2-

.

.

This report stated in part, " PSI has not yet issued a Purchase Order

or Letter of Intent to Newberg Marble Hill. Although all work has

been accomplished under the same conditions that would be expected

had the issuance been accomplished, undue criticism may be expected.

The potential for a possible Citation from the NRC, if discovered

during an audit, is greatly compounded ..."

,

This item was discussed at this meeting and further information, in

addition to that already provided by Mr. F. R. Hodges, was requested.

This item remains unresolved. (546/79-28-01; 547/79-28-01)

Unresolved Items

Unresolved items are matters about which more inf r ation is required in

order to ascertain whether they are acceptable items, items of noncom-

pliance, or deviations. Unresolved items disclosed during the inspection

are discussed in Paragraph 3 of the Details Section.