Georgia Power Company Post Cftce 80x 4545 At'an*3. Georg'a 3o3o2 Ab Te'echone 4c4 522-6cCO Vogtle Proj.ect Southern Company Seroces. Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Te!echene 2c5 870-6cn February 12, 1980 United States Nuclear Regulatory Commission File: X7BG31 Office of Inspection and Enforcement Log: GM-568 Recion II - Suite 3100 101 tiarietta Street Atlanta, GA 30303 Attn: Mr. James P. O'Reilly

Reference:

RII:FSC; 50-424; 50-425 Confirmation of Concurrence letter from NRC dated February 8,1980 Gentlemen:

Further to our letters of November 15, 1979 (GM-526); November 21, 1979 (GM-528); November 29, 1979 (GM-530); December 6, 1979 (GM-531);

December 12, 1979 (GM-534); December 13, 1979 (GM-535); January 8, 1980 (GM-544); and January 10, 1980 (GM-546) and in response to the above referenced letter of concurrence, we wish to submit the following information:

Attached you will find a set of conference notes dealing with the erosion and dewatering at Plant Vogtle. These minutes provide a summary status and outline additional plans we believe are required to accomplish the necessary dewatering in the powerblock backfill. The plan of action, as outlined in the minutes, was reviewed with your Mr. Jack Harris during his recent inspection at the Vogtle site last Friday, February 8,1980.

It is our desire to commence work on these additional plans this coming Friday, February 15, 1980. We trust you will find these additional steps in keeping with our overall commitments on this matter and will concur with our proceeding as stated.

This response contains no proprietary information and may be placed in the NRC Public Document Rooms upon receipt.

\ _

urs r tr ly Doug D'tton MN x Project General Manager Attachment

\

cc: (see page 2) 8 002200 hl

Mr. James P. O'Reilly Pace 2 February 12, 1980 cc: Mr J. H. f tiller, Jr.

Mr. W. E. Ehrensperger Mr. R. E. Conway "r. K ft. Gillespie ffr. E. D. Groover Mr. R. Staffa Mr. J. A. Bailey Dr. M. Z. Jeric

, Director of fluclear Reactor Regulation Attn: L. Rubenstein Division of Project Manacement U.S. NRC Washington, D.C. 20535 (Ref: NRC Docket Number 50-424/50-425 Construction Permit Number CPPR-103 3 CPPR-109