ML19296B403

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 80-001/01X-1
Date released: 11/06/2019 Download: ML19296B403


Updated LER 80-001/01X-1:on 800103,while Performing Maint During Cold Shutdown,Personnel Noted Clevis Pin Missing from Strut on Drywell Penetration Restraint E11-X13B.Caused by Improper Installation.Substitute Pin Installed
ML19296B406
Person / Time
Site: Hatch 
Issue date: 02/13/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B406 (3)
Forwards Updated LER 80-001/01X-1
ML19296B402
Person / Time
Site: Hatch 
Issue date: 02/13/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B402 (1)