ML19296B332

From kanterella
Jump to navigation Jump to search
Requests Revisions to Tech Specs,To Allow Operation Following Fifth Refueling.Forwards Proposed Revisions, NEDO-24230, Supplemental Reload Licensing Submittal for Cooper Station Unit 1,Reload 5 & Fees
ML19296B332
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/08/1980
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Ippolito T
Office of Nuclear Reactor Regulation
Shared Package
ML19296B333 List:
References
LQA8000055, NUDOCS 8002200426
Download: ML19296B332 (4)


Text

"

LQA8000055 yf-

~ '

O

_ y{ { === ,

February 8,1980 Director, Nuclear Reactor Regulation Attention: Mr. Thomas A. Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Reload Licensing Submittal, Reload 5, Cycle 6 Cooper Nuclear Station NRC Docket No. 50-298, DPR-46

Dear Mr. Ippolito:

In accordance with the provisions of the Atomic Energy Act of 1954, and the amendments thereto, the Nebraska Public Power District requests that the operating license for Cooper Nuclear Station be revised to allow operation following the fifth refueling of the reactor.

Specifically, the results of the plant unique analysis are presented in the " Supplemental Reload Licensing Submittal for Cooper Nuclear Station Unit 1, Reload 5", NEDO-24230, dated December 1979, and are submitted as an enclosure to this letter. This document has been prepared utilizing the format contained in Appendix A of Ger.eral Electric Report NEDE-24011-P "BWR Generic Reload Fuel Application".

Proposed changes to the Cooper Nuclear Station Technical Specifications are enclosed with the changes as follows:

1. The Rod Block Monitor setpoint is being changed from 105% to 107% due to the results of the rod withdrawal error analysis.
2. The operating Minimum Critical Power Ration (MCPR) limits and Overpressurization Analysis results are revised .
3. Maximum Average Planar Linear Heat Generation Rate (MAPLHGR) curves are being added for type P8DRB265L and P8DRB283 fuel.
4. The requirement for the Safety / Relief Valve (SRV)

Bellows Monitoring System is only applicable to three stage SRV's. It is planned to replace all three stage SRV's with two stage valves.

80022gg i

Mr. Thomas A. Ippolito February 8,1980 Page 2

5. Various reference and editorial changes in the Bases sections .

The schedule for this refueling outage currently indicates that the station will be shutdown beginning March 15, 1980, for a period of approximately eight weeks; therefore, Nebraska Public Power District respectfully requests approval of this license amendment prior to May 1,1980. A brief summary of the station modifications planned for this outage is enclosed for your information.

The safety significance of these proposed changes has been reviewed by appropriate District personnel, and under 10CRF170, these changes are judged to be a Class III amendment. Payment in the amount of $4,000 is enclosed.

Should you have any questions or require additional information, please do not hesitate to contact me.

In addition to three signed originals, 37 copies of the proposed changes are also submitted.

Sincerely yours, W

. ilant Director of Licensing and Quality Assurance JMP/mrh:bn7/3 Encisoures

Mr. Thomas A. Ippolito February 8,1980 Page 3 STATE OF NEBRASKA )

) ss PL ATTE COUNTY )

Jay M. Pilant, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to execute this request on behalf of Nebraska Public Power District; and that the statements in said application are true to the best of his knowledge and belief.

M M.' Pilant Subscribed in my presence and sworn to before me this day of February ,1980.

Z

/ NOTARY PUBLIg My Commission expires [/ /kd .

z M 887Aff

  • 8tses or seeruhl WEYN R. HOHNDOM

' %C"B f4 oca.t4,isen

SUM &GY OF MAJOR STATION MODIFICATIONS SPRING 1980 REFUELING OUTAGE COOPER NUCLEAR STATION

1. Feedwater nozzle and sparger modifications per NED0 21821.
2. The following are the Mark I Containment Program modifications which are presently planned:

a) Installation of new 10" vacuum breakers on the S/RV lines.

b) Install approximately 50 drywell supports on the S/RV lines.

c) Perform maintenance on the wetwell-drywell vacuum breakers.

d) Reroute the S/RV lines in the wetwell.

e) Install T-quenchers on the S/RV lines, f) Install a vent header deflector.

g) Truncate the downcomers.

h) Brace the downcomers.