LlOOw/v c.s n.
~
UNITED STATES
$ ',7 i NUCLEAR REGULATORY COMMISSION
'5
.,%%)Q.1;'f
.MSWNGTON. D C. 20555 Docket No. 50-201 RM 50-6 MEM0PANDUM FOR: Leland C. Rouse, Chief Advanced Fuel and Spent Fuel Licensing Branch FROM:
Charles J. Haughney Advanced Fuel and Spent Fuel Licensing Branch
SUBJECT:
MEETING
SUMMARY
LICENSEES:
Nuclear Fuel Services, Inc. (NFS) and New York State Energy Research and Development Authority (NYSERDA)
FACILITY:
Western New York Nuclear Service Center, West Valley, New York Puroose: To discuss the progress of NFS efforts to process technical data useful for future decontamination and decommissioning of the West Valley facility.
Place and Date: Nuclear Regulatory Commission (NRC)
Office of Nuclear Material Safety and Safeguards Silver Spring, MD, October 10, 1979 Particioants :
Please see attached list.
Index NFS of Facility Design Cata:
Indices of design data for plant area 5, Product Purification, Storage, Handling and Shipping and Plant area 6, Off Gas Treatment have been completed.
The next plant area to be worked on is plant area 7, Liquid Waste Treatment.
Copies of the indices for areas 5 and 6 are attached.
Report of Decontamination History:
Sections of the decontamination history that describe decontamination efforts in the Acid Recovery Pump Room, the Off-Gas Blower Room and South Stairwell have been developed as draft working papers. The next portions of the report to be developed will describe work in head end mechanical cells.
80022 00 h
Leland C. Rouse -
Next Meeting:
The next meeting is scheduled for 1:30 p.m., Wednesday, December 5,1979 at the NRC offices in Silver Spring, MD.
.A %
Charles J. Haugh ey
[,
Advanced Fuel and Spent FueV Licensing Branch Division of Fuel Cycle and Material Safety cc:
Distribution List J. Russell, EPA
PARTICIPAtlTS NRC/flFS/NYSERDA MEETING OCTOBER 10, 1979 Participants C. J. Haughney, USNRC J. P. Duckworth, NFS T. K. DeBoer, NYSERDA J. R. Clark, NFS N. J. Newman, NFS A. Abriss, flRC Observers B. Crofford
DRAFT OCTOBER,1979 AREA 5 - PRODUCT PURIFICATION, STORAGE, HNIDLIf1G AND SHIPPING 1.0 PROCESS 1.1 Bechtel Drawings SP,-A-1 P&ID, Uranium Storage SR-A-2 P&ID, Purification & Shipping (Pu) 5R-A-3 P&ID, Uranium Purification 5D-A-7 Pu Purification, Material Balance Data SD-A-8 U Purification, Material Balance Data 5A-A-12 Mechanical Flow Diagran, PPH 5A-A-13 P&ID, PPS 5R-A-21 Instrument Control Diagram 1.2 11FS Drawings SD-A-1030 Uranium-Dilution System SD-A-1031 Uranium Dilution System 2.0 LAYOUTS 2.1 Bechtel Drawinas 15A-A-lD3 Plot Plan, Process Area 15A-A-ll5 Overall Plan, Process Area 15A-A-ll8 Gen'l Arrg't Plans at 114'6" 15A-A-119 Gen'l Arrg't Plans at 131' 15A-A-120 Gen'l Arrg't Plans at 144' 15A-A-123 Gen'l Arrg't Process Bldg. Section #2 15A-A-124 Gen'l Arrg't Process Bldg. Section #3 15A-A-125 Gen'1 Arrg't Process Bldg. Section #4 15A-A-150 Equipt. Arrg't Cell #3 15A-A-151 Equipt. Arrg't Cell #3 15A-A-152 Equipt. Arrg't PPC 15A-A-153 Equipt. Arrg't PPC Plans 15R-A-163 Equipt. Arrgt. LWA 3.0 EQUIPMEtlT 3.1 SC-1A fio.1 Pu Ion Exchanger SC-1B flo. 2 Pu Ion Exchanger SC-lC fio. 3 Pu Ion Exchanger
DRAFT OCTOBER,1979 Drawings SB-C-1 Pu Ion Echangers SC-1A,B,1C (Bechtel) 15C-4-1 Code Certificate SC-1 A (Vendor) 15C-4-2 Code Certificate SC-1B (Vendor) 15C-4-3 Code Certificate SC-lC (Vendor) 15C-4-7 Procedure Spec Welding (Vendor) 15C-4-9 flame Plate SC-1 A (Vendor) 15C-4-10 flame Plate SC-18 (Vendor) 15C-4-ll flame Plate SC-lC (Vendor) 15C-4-12 End Flange (Vendor) 15C-4-13 Elevation Details (Vendor) 5D-T-502 Screens for Columns (!1FS) 5D-T-520 Screens for Columns (flFS)
Specifications 4413-A-1 General 4413-C-1 Titanium Equipment 4413-C-2 Chrome flickle Stainless Equipt 4413-X-1 Surface Preparation Material Reouisition 4413-15C-4 Pu Ion Exchange Columns 3.2 SC-2 Pu Product Evaporator Drawings DS-5C-2 Data Sheet (Bechtel) 15E-D-5 Stub fiozzle Detail (Bechtel) 15E-D-9 Pipe Leg Supports (Bechtel) 15E-D-10 Type 3S Sample Conn (Bechtel) 15E-D-11 Fabrication Tolerances (Bechtel) 15E-D-13 Types 2B & 38 Level Recorder & Density Indicators (Bechtel) 15C-2-2 Pu Product Evaporator (Vendor) 15C-2-15 Welding Procedure 300. Series (Vendor) 15C-2-16 Procedure Qualification (Vendor) 15C-2-17 Procedure Qualification (Vendor) 15C-2-18 Procedure Qualification (Vendor) 15C-2-19 Procedure Qualification (Vendor) 15C-2-20 Procedure Qualification (Vendor) 15C-2-23 Titaniua Welding Proc. (Vendor) 15C-2-45 List of Material Specs (Vendor) 15C-2-46 Assembly & Details Pu Evap (Vendor)
Specifications 4413-A-1 General 4413-C-1 Titanium Equipment 4413-C-2 Chrome flickle Stainless Equipt 4413-C-502 Fabrication of Pressure Vessels
DRAFT OCTOBER,1979 flaterial Reouisition 4413-15-C-2 Evaporators 3.3 SC-4 Low Enriched U Product Evaporator Drawings DS-5C-4 Data Sheet (Bechtel) 15E-D-5 Stub Nozzle Detail (Bechtel) 15E-D-9 Pipe Leg Supports (Bechtel) 15E-D-10 Type 3S Sample Conn (Bechtel) 15E-D-ll Fabrication Tolerances (Bechtel) 15E-D-13 Types 2B & 3B Level Recorders and Density Indicators (Bechtel) 15C-2-3 Low Enriched U Prod. Evap. (Vendor) 15C-2-15 Welding Procedures (Vendor) 15C-2-32 Drawing Index (Vendor) 15C-2-33 Tube Layout (Vendor) 15C-2-34 Shop Details (Vendor) 15C-2-35 Shop Details (Vendor) 15C-2-40 Reflux Distributor (Vendor) 15C-2-122 Heater to Down Leg (Vendor) 2A-16916 Separator (Ver. dor)
Soecifications 4413-A-1 General 4413-C-2 Chrome Nickle Stainless Equipt 4413-C-502 Fabrication of Pressure Vessels Material Requisition 4413-15C-2 Evaporators 3.4 SC-5 High Enriched U Product Evaporator Drawings DS-5C-5 Data Sheet (Bechtel) 15E-D-5 Stub Nozzle Detail (Bechtel) 15E-D-10 Type 3S Sample Conn (Bechtel) 15E-D-ll Fabrication Tolerances (Bechtel) 15E-D-13 Types 2B & 3B Level Recorders and Density Indicators (Bechtel) 15C-2-4
~
High Enriched Evaporator (Vendor) 15C-2-15 Welding Procedures (Vendor) 15C-2-29 List of itaterial (Vendor) 15C-2-30 Reboiler Details (Vendor) 15C-2-31 Evaporator Body Details (Vendor) 2A-16917 Separator (Vendor)
DRAFT OCTOBER,1979 Specifications 4413-A-1 General 4413-C-2 Chrome flickle Stainless Equipt 4413-C-502 Fabrication of Pressure Vessels fiaterial Reouisition 4413-15C-2 Evaporators 3.5 SC-6A #1 Uranium Silica Gel Bed SC-6B #2 Uranium Silica Gel Bed Drawings 5B-C-2 Uranium Silica Gel Columns SC-6A & 6B (Bechtel) 15C-4-14 flame Plate (Vendor) 15C-4-15 flame Plate (Vendor) 15C-4-16 End Flanges N1 & fl2 (Vendor) 15C-4-17 Elevations & Details (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipt 4413-C-502 Fabrication of Pressure Vessels 14aterial Reouisition 4413-15C-4 Uranium Silica Gel Beds 3.6 50-1 Pu Ion Exchange Feed Conditioner 50-4 Pu Evaporator Feed Tank 50-5A #1 Pu Product Storage Tank 50-5B #2 Pu Product Storage Tank Drawings SA-D-1 Pu Feed Conditioner (Bechtel)
Pu Evap. Feed Tank
- 1 Pu Prod. Storage Tank
- 2 Pu Prod. Storage Tank 5D-14-1 Butt Boral Joint (Vendor) 50-14-2 Joint Location Boral Plates (Vendor) 50-14-3 LR & DI Connections (Vendor) 5D-14-4 Sample Connections (Vendor) 50-14-5 Support Legs (Vendor) 50-14-6 Stub Nozzle & Details (Vendor) 50-14-7 Layout of Boral Plates (Vendor) 50-14-8 General Arrg't Details (Vendor) 5D-14-9 tiozzle Details (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-tiickle SS Equipt 4413-C-504 Pressure Vessels Designed by Purchaser
DRAFT OCTOBER,1979 Material Requisition 4413-50-14 Pu Feed and Storage Tanks 3.7 50-2 Pu Ion Exch Waste Catch Tank Drawings 5B-D-2 Pu Ion Exch Waste Tank (Bechtel) 15D-3-1 Welding Procedure (Vendor) 15D-3-2 Welding Procedure (Vendor) 150-3-3 Welding Procedure (Vendor) 15D-3-4 Welding Procedure (Vendor) 15D-3-5 Welding Procedure (Vendor) 150-3-15 Stub flozzle (Vendor) 150-3-16 Plans, Elevations & Details (Vendor)
Soecifications 4413-A-1 General 4413-C-2 Chrone-flickle SS Equipment 4413-C-504 Pressure Vessels by Purchaser fiaterial Reouisition 4413-150-3 Pu Ion Exchange Tank
- 3. 8 50-6 Pu Evaporator Condenser Tank 50-7 U Product Evaporator Feed Tank Drawings 58-D-5 Pu Evap. Cond. Tank & U Prod. Feed Tank (Bechtel) 150-3-10 Plan Elevations and Notes (Vendor) 150-3-11 Stub Nozzle Details (Vendor) 150-3-24 Stub Nozzle Details (Vendor) 50-3-25 Plan Elevations & flotes (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-flickle SS Equipment 4413-C-504 Pressure Vessels by Purchaser Material Requisition 4413-150-13 Pu Evaporator Condensate Tank U Product Evaporator Feed Tank
DRAFT OCTOBER,1979 3.9 50-8 U Product Evaporator Condensate Tank 5D-9 U Product Surge Tank 5D-11 Regeneration Waste Tank Drawings 5B-D-2 5D-11 Regeneration Waste Tank (Bechtel)
SB-D-7 U Product Condensate and Surge (Bechtel) 150-3-7 tiozzle End 50-9 (Vendor) 15D-3-9 U Product Surge Tank (Vendor) 150-3-12 Stub tiozzle 50-3 (Vendor) 15D-3-13 Plan Elevation and ?!otes (Vendor) 150-3-14 Stub ilozzle (Vendor) 159-3-17 Plan Elevation and flotes (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-flickle SS Equipment Material Recuisition 4413-15D-3 U Product Tanks 3.10 SD-12-A tio. 1 U Product Sample Tank 50-12-B llo. 2 U Product Sample Tank Drawings 5B-D-9 U Product Sample Tanks (Bechtel) 5D-17-1 Plan Elevation and Gen flotes (Vendor)
SD-17-2 Miscellaneous Details (Vendor) 50-17-3 Helium Leak Test Proc. (Vendor) 50-17-4 Fabrication Tolerances (Vendor) 5D-17-33 Material Testing Requirements (Vendor) 50-17-40 Welding Procedure (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-flickle SS Equipment 4413-X-1 Surface Preparation 4413-C-504 Pressure Vessels by Purchaser 11aterial Reauisition 4413-15D-17 Stainless Steel Process Tanks 3.11 SD-13A High Enriched U Product Tank 50-13B High Enriched U Storage Tank Drawings 5B-D-10 High Enriched Storage Tanks (Bechtel) 150-30-3 Plans, Elevations & Gen flotes (Vendor)
DRAFT OCTOBER,1979 Specifications 4413-A-1 General 4413-C-2 Cvome-flickle SS Equipment 4413-C-504 Pressure Vessels by Purchaser Material Requisi-ion 4413-15D-3 High Enriched U Product Storage Tanks 3.12 SD-15C Off-Spec Pu Storage Tank Drawings 5B-D-10 Off-Spec Pu Storage Tank (Bechtel) 15D-38-3 Plans, Elevations & flotes (Vendor)
Soecifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment 4413-C-504 Pressure Vessels by Purchaser Material Recuisitian 4413-150-3 Off-Spec Pu Storage Tank 3.13 50-15A U Product Storage Tank 5D-15B U Product Storage Tank Drawings 5B-0-11 U Product Storage Tank 50-15A (Bechtel) 5B-D-17 U Product Storage Tank 50-15B (Bechtel) 15D-2-3 Elevations Sections & Notes (Vendor) 150-2-10 Weiding Procedure (Vendor) 15D-2-17 Miscellaneous Details (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-flickle SS Equipment 4413-C-504 Pressure Vessels by Purchaser Material Requisiticn 4413-150-2 Stainless Steel Process Tanks
D R A l'T OCTOBER,1979 3.14 5D-20 Hot Water Tank Drawings 58-D-15 Hot Water Tank 50-20 (Bechtel) 50-17-5 Plans, Elevation & Gen Notes (Vendor) 50-17-6 Preparation of Painted Surfaces (Vendor) 50-17-7 Helium Leak Test (Vendor) 50-17-8 Tolerance Sheet (Vendor)
Soecifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment Material Requisition 4413-15D-17 Stainless Steel Process Tanks 3.15 SE-3 V Product Evaporator Reboiler SE-4 U Product Evaporator Condenser SE-6 Hi Enriched U Evap Reboiler SE-7 Pu Prod Evap Condenser Drawinas DS-5E-3 Data Sheet (Bechtel)
DS-5E-4 Data Sheet (Bechtel)
DS-5E-5 Data Sheet (Bechtel)
DS-5E-6 Data Sheet (Bechtel)
DS-5E-7 Data Sheet (Bechtel) 15C-2-6 Pu Prod Evap Cond (Vendor) 15C-2-7 U Prod Evap Cond (Vendor) 15C-2-8 Hi Enrich U Evap Cona (Vendor) 15C-2-15 Welding Procedure (Vendor) 15C-2-23 Material of Construction (Vendor) 15C-2-24 Condenser (Vendor) 15C-2-49 Material Specification (Vendor) 15C-2-50 Shop Details (Vendor) 15C-2-96 List of Material Specs (Vendor) 15C-2-97 Shop Details (Vendor) 15E-D-5 Stub Nczzle Detail (Bechtel) 15E-D-9 Pipe Leg Support (Bechtel) 15E-0-10 Type "35" Sample Conn (Bechtel)
ISE-D-ll Fabrication Tolerances (Bechtel)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment 4413-C-502 Fabrication of "essels by Purchaser 4413-C-504 Documents Req of Vessels by Purchaser Material Requisition 4413-15C-2 Evaporators
DRAFT OCTOBER,1979
-g-3.16 SE-9 Ion Exchange Waste Cooler 5E-10 Low Enriched U Evap Prod Cooler SE-ll High Enriched V Evap Prod Cooler Drawings DS-5E-9 Data Sheet (Bechtel)
DS-5E-10 Data Sheet (Bechtel)
DS-5E-ll Data Sheet (Bechtel)
SP-151 Isometric SE-9 (Bechtel)
SP-178 Isometric SE-9 (Bechtt.1)
SP-40 Isometric 5E-10 (Bechtel)
SP-36 Isometric SE-10 (Bechtel)
SP-45 Isometric 5E-Il (Bechtel)
SP-122 Isometric SE-ll (Bechtel)
Soecification As directed by data sheet.
Material Requisition Not applicable.
3.17 SG-1 First U Cycle Strip Feed Punp SG-1A First U Cycle Strip Feed Pump SG-2 Silica Gel Feed Pump SG-2A Silica Gel Feed Pump SG-6 Low Enriched U Product Loadout Pump SG-7 Hot Water Pump Drawings DS-5G-1 Data Sheet (Bechtel)
DS-5P-2 Data Sheet (Bechtel)
DS-SP-3 Data Sheet (Bechtel) 15G-3-7 Strip Feed Pump (Vendor) 15G-3-8 Silica Gel Pump (Vendor) 15G-3-9 Low Enrich Loadout Pump (Vendor) 15G-3-10 Hot Water Pump (Vendor) 15G-3-28 Perforamcne Curve SG-2 (Vendor) 15G-3-29 Performance Curve SG-2 (Vendor) 15G-3-32 Perfcrmance Curve SG-6 (Vendor) 15G-3-50 Performance Curve SG-1A (Vendor) 15G-3-51 Performance Curve SG-1 (Vendor) 15G-3-52 Performance Curve SG-7 (Vendor)
Specifications 4413-A-1 General 4413-A-2 Equipment in Radioactive Areas 441?-X-1 Surface Preparation 4413-G-1 Pump Specification
DRAFT cCTOBER,1979 Material Requir' tion 4413-15G-3 Canned Pumps 3.18 SG-5 High Enriched V Loadout Pump 5G-10 Pu Ion Exch Feed Pump 5G-12 U Product Off-Spec Pump Drauirg DS-5G-5-2 Data Sheet (Bechtel)
DS-SP-1 Data Sheet (Bechtel) 15G-6-2 High Enriched Loadout Pump (Vendor) 15G-6-3 Pu Ion Exch Feed Pump (Vendor:
15G-6-8 Motors for SG-5 and SG-10 (vei dor) 15G-6-9 Motor for SG-12 (Vendor) 15G-6-ll Cylinder Operator (Vendor) 15G-6-12 Actuator (Vendor) 15G-6-13 Positioner (Vendor) 15G-6-16 Operator Parts List (Vendor)
Specifications 4413-A-1 General 4413-A-2 Material in Radioactive Areas 4413-G-1 Pump Specification Material Reouisition 4413-15G-6 Process Pumps 3.19 SV-1 Uranium' Product Weigh Tank Drawings 15E-0-10 Type 35 Sample Connections (Bechtel) 15E-D-13 Level Recorder and Density Indicator (Bechtel)
SV-65-1 Cabinet Dial (Vendor)
SV-65-2 Tank Scale (Vendor)
SV-65-3 Weigh Scale Tank (Vendor) 5V-65-5 Spara Parts (Vendor)
SV-65-6 "CA" Dial Parts (Vendor)
SV-65-7 Parts List and Instructions (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrone-Nickle SS Equipment 4413-V-26 Low Enriched V Product Weigh Tank Material Requisitien 4413-5V-65 U Product Weigh Tank
DRAFT OCTOBER,I979 3,20 SV-2 Pu Packaging Glove Box 15T-50 Shielded Bottle Cart 15T-14 Hoist & Trolley 5V-7 Pu Weigh Scale 15T-66 Birdcage Transfer Cart Drawings SV-66-3 Welding Procedure (Vendor) 5V-66-4 Electrical Layout (Vendor)
SV-66-8 Pu Glove Box Specs (Vendor)
SV-66-9 Pu Glove Box Assembly (Vendor) 5V-66-10 Window and Port Layout (Vendor)
SV-66-ll Dry Box Section (Vendor) 5V-66-12 Entry Door and Drive Ass'y (Vendor)
SV-66-13 Weigh Door Assembly (Vendor) 5V-66-14 Fill Door Drive Assembly (Vendor)
SV-66-15 Door Drive Details (Vendor)
SV-66-16 Transfer Cart Birdcage (Vendor) 5V-66-17 Birdcage Drive Track (Vendar) 5V 46-18 Electrical Layout (Vendor) 5V-66-19 Details (Vendor) 5A-T-1 Pu Glove Box Sheet 1 (Bechtel)
SA-T-2 Pu Glove Box Sheet 2 (Bechtel) 15RA-74 P&ID Ventilation System Above 131'-0 (Bechteli 15A-A-171 Equipment Arrg't PPS (Bechtel) 15A-A-172 Equipt Arrg't PPS Sections (Bechtcl)
SA-A-13 P&ID PPS (Bechtel) 5V-66-20 Details (Vendor)
SV-66-21 Bottle Fill Cart (Vendo")
SV-66-22 Plan & Sections (Vendor)
SV-66-23 Door Details (Vendor) 5V-66-24 Door Sections (Vendor)
SV-66-25 Light Details (Vendor)
Specifications 4413-A-1 General 4413-X-1 Painting Spec 4413-C-2 Chrome-Nickle SS Equipment 4413-V-34 Pu Prod Packaging Glove Box Material Requisition 4413-15V-66 Pu Prod Packagin Glove Box
DRAFT OCTOBER,1979 3.21 5V-4 U Product Weigh Scale Drawinas iSV-67-1 Platform Scale (Vendor) 15V-67-2 Technical fianual (Vendor) 15V-67-4 Schematic (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment Material Recuisition 4413-15V-67 Weigh Scale SV-4 NOTE: The following itens were field fabricated at the site to Bechtel field piping specifications and field requisitions.
3.22 5Y-2 Flow Control Pot 50-7 to 50-9 Drawincs 5P-24 Line Isometri _ (2--htel) 5P-25 Line Isomet ic (Bechtel.'
3.23 SY-3 Flow Control Pot SD 7 to SC-4 Crawin9s 5P-25 Line Isone:ric (Bechtel)
SP-27 Line Isometric (Bechtel) 3.24 5Y-4 Level Control Pot for SC-4 Drawings 5P-108 Line Isometric (Bechtel)
SP-36 Line Isomitric (Bechtel) 3.25 SY-5 Level Control Pot for SC-5 Drawinas 5P-44 Line Isometric (Bechtel)
SP-22 Line Isometric (Bechtel)
DRAFT OCTOBER,1979 3.26 5Y-10 Pu Transfer Port Drawings SP-254 Line Iscmetric (Bechtel)
SP-256 Line Isometric (Bechtel) 3.27 5Y-11 Pu Transfer Pot Drawings SP-255 Line Isometric (Bechtel)
SP-686 Line Isometric (Bechtel) 3.28 5Y-13 Separator for SC-1A Drawings 14CH-372 Line Isometric (Bechtel)
SP-141 Line Isometric (Bechtel) 3.29 5Y-14 Sanple Pot for SC-1A prawings 14CH-390 Line Isometric (Bechtel) 5P-160 Line Isometric (Bechtel) 5P-144 Line Isometric (Bechtel) 3.30 SY-15 Separator for SC-1B Drawings 14CH-375 Line Isometric (Bechtcl)
SP-142 Line Isometric (Bechtel) 3.31 5Y-16 Sample Pot for SC-1B Dr_awings 5P-161 Line Isometric (Bechtel) 5P-145 Line Isometric (Bechtel) 3.32 5Y-17 Separator for SC-lC Drawings 14CH-374 Line Isometric (Bechtel)
SP-143 Line Isometric (Bechtel)
DRAFT OCTOBER,1979 3.33 5Y-18 Sample Pot for SC-lc Drawings SP-162 Line Isometric (Bechtel)
SP-146 Line Isometric (Bechtel) 3.34 SY-21 Measuring Pot High Enr U Drawincs SP-370 Line Isometric (Bechtel)
SP-388 Line Isometric (Bechtel)
SP-387 Line Isometric (Bechtel) 3.35 5Y-26 Flow Control Pot 5D-6 to SD-4 Drawinas 5P-238 Line Isometric (Bechtel) 5P-244 Line Isometric (Bechtel) 3.36 SY-27 Flow Control Pot 50-6 to 4D-8 Drawings SP-245 Line Isometric (Bechtel) 5P-253 Line Isometric (Bechtel) 3.37 5Y-28 Flow, Control Pot 5D-7 to SC-5 Drawinas SP-8 Line Isometric (Bechtel)
SP-90 Line Isonetric (Bechtel)
SP-5 Line Isometric (Bcchtel) 3.38 5Y-29 Head Pot SC-6A Drawings SP-64 Line Isemetric (Bechtel)
SP-647 Line Isometric (Bechtel) 3.39 5Y-30 Head Pot SC-6B Feed Drawinos SP-65 Line Isometric (Cechtel) 5P-648 Line Isometric (Bechtel)
DRAFT OCTOBER,1979 3.40 SY-31 Syphon Breaker SC-6A Discharge Drawings SP-72 Line Isometric (Bechtel)
SP-68 Line Isometric (Bechtcl) 3.41 5Y-32
- Syphon Breaker SC-6B Drawings SP-74 Line Isonetric (Bechtel)
SP-70 Line Isonetric (Bechtel) 3.42 5Y-33 Sample Pot for Wash Line Drawings SP-73 Line Isometric (Bechtel) 5P-654 Line Isometric (Bechtel) 4.0 NFS 4.1 Pu Product Loadout Tank Drawings 5D-D-793 New Pu Loadout Tank 50-D-794 New Pu Loadout Tank Snecifications As specified on drawings Material Requisition NA 5.0 GENERAL 50-T-246 Mixer 5D-T-251 Analytical Pan Supports 5C-T-346 Pu Gottle Holder SC-T-604 Hi Enriched Loadout Hood SC-T-687 ili Enriched U Loadout - 2 Sheets 5C-T-690 Hi Enriched U Storage Container SC-T-691 Rails - Cage Carriage SC-T-692 Cage Carriage Hi Enriched U Product 5B-T-700 High Enriched U Transfer Cart
DRAFT 10/79 AREA 6 - 0FF GAS TREATf1ENT 1.0 PROCESS 1.1 Bechtel Drawings 6R-A-1 P&ID, Process Off Gas and Vent System 6R-A-2 P&ID, Process Off Gas and Vent System 2.0 LAYOUTS 2.1 Bechtel Drawings 15A-A-101 Overall Plot Plan 15A-A-ll5 Overall Plan, Process Area 15A-A-ll8 Gen Arrg't Process Bldg at Elev 114'6" 15A-A-119 Gen Arrg't Process Bldg at Elev 131' 15A-A-122 Gen Arrg't Process Bldg Section #1 15A-S-124 Gen Arrg't Process Bldg Section #3 15A-A-146 Equipt Arrgt Ext Cell and Elevation 15A-A-147 Equipt Arrgt Ext Cell #1 Plans 15A-A-154 Equipt Arrgt Off-Gas Cell Elevation 15A-A-158 Equipt Arrgt Off Gas Cell Elev 100' 15A-A-159 Equipt Arrgt Off Gas Cell Elev 111'6" 15A-A-160 Equipt Arrgt Off Gas Cell Elev 131' 15A-A-161 Equipt Arrgt Off Gas Cell Elev 144' 3.0 EQUIPMENT 3.1 Bechtel 3.1.1 6C-1 Dissolver Off Gas Silver Reactor 6C-1A Dissolver Off Gas Silver Reactor Drawines 68-C-1 Silver Reactors 6C-1 & 6ClA (Bechtel) 15C-4-20 Stub Nozzle Detail (Vendor) 15C-4-22 16" Flanged Nozzle (Vendor) 15C-4-23 18" Finaged Nozzle (Vendor) 15C-4-24 Elevation Details & Notes (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle Stainless Steel Equipment Material Requisition 4413-15C-4 Process Equipment
DRAFT 10/79.
3.1.2 6C-3 Vessel Off-Gas Scrubber 6C-6 Dissolver Off-Gas. Scrubber Drawings 6B-C-2 Vessel Off Gas Scrubber (Bechtel) 6B-C-3 Dissolver Off Gas Scrubber (Bechtel) 68-C-6 Misc. Details for Off Gas Scrubber (Bechtel) 15C-4-27 Stub Nozzle Detail (Vendor) 15C-4-28 Stub Nozzle Detail (Vendor) 15C-4-29 20" + 24" Flanged Nozzle (Vendor) 15C-4-30 Steam /CW Coil (Vendor) 15C-4-31 Sparger Ring (Vendor) 15C-4-32 Support Legs (Vendor) 15C-4-33 Elevation, Details and Notes (Vendor) 15C-4-34 Elevation, Details and f!otes (Vendor) 15C-4-46 fliscellaneous Details (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment fiaterial Reouisition 4413-15C-4 Process Equipment 3.1.3 60-3 Vessel Off-Gas Condensate Catch Tank Drawings 68-D-2 Vessel Off-Gas Condensate Catch Tank (Bechtel) 150-4-1 Stub Nozzle Details (Vendor) 15D-4-2 Plans, Elevations and Notes (Vendor) 15D-4-3 Support Leg Details (Vendor) 15D-4-4 Strainer Plate (Vendor) 15D-4-7 Level and Density Indicators (Vendor)
Soecifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment 4413-X-1 Painting and Finishing 4413-C-504 Documentation Requirements Material Requisition 4413-15D-4 Stainless Steel Process Tanks 3.1.4 6E-1 D0G Heater 6E-2 D0G Cooler 6E-3 V0G Condenser 6E-4 V0G Heater
DRAFT 10/79 Drawings DS-6E-1 Data Sheet.(Bechtel)
DS-6E-2 Data Sheet (Bechtel)
DS-6E-3 Data Sheet (Bechtel)
DS-6E-4 Data Sheet (Bechtel) 15E-1-1 Dissolver Off Gas Heater (Vendor) 15E-1-2 Dissolver Off Gas Cooler (Vendor) 15E-1-3 Vessel Off Gas Heater (Vendor) 15E-1-5 Vessel Off Gas Condenser (Vendor) 15E-1-7 Welding Procedure (Vendor) 15E-1-8 Welding Procedure Qualification (Vendor) 15E-1-16 flaterial Sheet (Vendor) 15E-1-17 Details (Vendor) 15E-1-19 Expansion Joint (Vendor) 15E-1-22 DOG Cooler (Vendor) 15E-1-23 V0G Heater (Vendor) 15E-1-24 V0G Heater (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment 4413-E-1 Tubular Heat Exchangers Material Reauisition 4413-15E-1 Process Heaters & Coolers 3.1.5 6E-6 Steam Superheater Drawings DS-6E-6 Data Sheet (Bechtel) 6E-10-1 Steam Superheater (Vendor) 6E-10-2 Wiring Diagram (Vendor) 6E-10-3 8" Flange Immersion Unit (Vendor)
Specifications 4413-A-1 General 4413-C-2 Chrome-Nickle SS Equipment 4413-E-1 Tubular Heat Exchangers Material Reauisition 4413-6E-10 Steam Superheater 3.1.6 6G-2 V0G Recirculation Pump 6G-3 D0G Recirculation Pump l
l 3
DKAFT 10/79 Drawings DS-6G-2 Data Sheet (Bechtel)
DS-6P-2 Data Sheet (Bechtel) 15G-3-11 V0G Scrubber Pumo (Vendor) 15G-3-12 00G Scrubber Pump (Vendor) 15C-3-34 Pump Curve (Vendor) 15G-3-53 Pump Curve (Vendor)
Soecifications 4413-A-1 General 4413-A-2 Materials in Radioactive Areas 4413-G-1 Pump Specification Material Reauisition 4413-15G-3 Canned Pumps 3.1.7 6K-1 D0G Blower 6K-1A DOG Blower 6K-2 V0G Blower 6K-2A V0G Blower Drawings DS-6P-1 Data Sheet (Bechtel) 15K 1 DOG & V03 Blowers (Vendor) 15 K-1 -2 Painting Instructions (Vendor) 15K-1-3 Motor (Vendor) 15K-1-4 Motor (Vendor) 15K-1-5 Performance Curve (Vendor) 15K-1-6 Outline (Vendor) 15K-1-7 Maintenance Data (Vendor) 15K-1-8 Spare Parts (Vendor) 15K-1-ll Performance Curve (Vendor) 15K-1-12 Performance Curve (Vendor)
Specifications 4413-A-1 General 4413-X-1 Painting 4413-A-2 Material in Radioactive Areas Material Requisition 4413-15K-1 Process Eouipment 3.1.8 6T-1 00G Filter 6T-1A D0G Filter 6T-2 V0G Filter 6T-2A V0G Filter
DRAFT 10/79
. Drawings 6T-10A-1 Filter Can (Vendor) 6T-10A-2 Hold Down Fixture (Vendor) 6T-10A-3 Spider Ass'y (Vendor) 6T-108-1 Filter Assembly (Vendor) 6T-10B-2 Welding (Vendor) 6B-T-359 Off Gas - 'isions (NFS) 6B-T-594 Filter Tray (NFS) 6C-T-626 Filter Cover (NFS) 6B-T-954 6T-1 & 6T-1A Revisions (NFS)
Specifications 4413-A-1 General 4413-T-2 Off Gas Filters Material Peouisition 4413-6T-10 Off Gas Filters 3.2 NFS 3.2.1 6T-3 & 6T-3A Backup Filters 6V-1 Knockout Pot 6D-6 Knockout Pot Drawings 6R-A-1 P&ID Off Gas System (Bechtel) 6P-95 Line Isometric (Bechtel) 6P-96 Line Isometric (Bechtel) 6P-131 Line Isometric (Bechtel)
Soecifications As Specified on drawings.
Material Reauisition Not applicable.
3.3 General 6B-T-583 Off-Gas Cell Removal Cask 3 Sheets 6C-T-644 Lead Cask and Filter 6B-R-652 Floor Plan Filter Removal OGBR 60-R-653 Shielding Cask OGBR 68-T-654 Shielding Cask Details 6B-T-664 Bail Details 4 Sheets 6B-T-695 Filter Removal Cask & Dolly 6B-T-714 Periscope Mounting OGBR 6B-T-715 Window Installation OGBR 60-T-718 Plate & Fan Mountings