Forwards Revised Pages 4 & 11 of Topical Rept Evaluation of EDR-1, Ederer Nuclear Safety-Related Extra-Safety & Monitoring Cranes, Revision 1.Revised Pages Encl
ML19296B090
Person / Time
Issue date: 02/07/1980
From: Baer R
Office of Nuclear Reactor Regulation
To: Clark C
EDERER, INC.
Shared Package
ML19296B091 List:
References
NUDOCS 8002200050
Download: ML19296B090 (2)


Text

  • '

pm aso u 4

o, UNITED STATES NUCLEAR REGULATORY COMMISSION

{.!

.E W ASHINGTON. D. C. 20555

%..v j FEB 7 1980 Mr. C. William Clark, Jr.

Manager of Engineering Ederer Incorporated P. 0. Box 24708 Seattle, Washington 98124

Dear Mr. Clark:

SUBJECT:

REVIEW AND ACCEPTANCE OF TOPICAL REPORT EDR-1, EDERER'S NUCLEAR SAFETY RELATED extra-Safety And Monitoring (X-SAM) CRANE", REVISION 1 By a letter dated January 2,1980 we advised you that the Nuclear Regulatory Commission staff has completed its review of the Generic Licensing Topical Report EDR-1, "Ederer's Nuclear Safety Related extra-Safety And Monitoring (X-SAM) Cranes, Revision 1.

A sunrnary of our evaluation of the topical report was enclosed.

Subsequently, we have been advised by your representative that two statements within our " Topical Report Evaluation" may be misunderstood. We have reviewed this advice and conclude that the two statements should be changed to make our intent clear. Therefore, we request that you make the following changes to the

" Topical Report Evaluation" enclosed with our earlier letter.

Page 4, last 2 lines Change:

" consists of two sets of disc type brakes" to:

" typically con-sists of either disc or band type brakes" Page 11, first 3 lines Change:

"With a safety factor of 10 (7 on 90% of yield strength) on the wire rope there is ample reserve strength available." to:

"EDERER also sizes the wire rope to limit stresses in it during a seismic event to not exceed 90% of the yield strength of the wire rope with a 15% margin for degradation, which results in a margin of 1.5 for overload conditions (see page 13) and a minimum of 1.1 for peak seismic overload."

We are enclosing revised pages 4 and 11. Please replace these pages with the enclosed sheets and discard the original sheets. We have indicated the change by a line in the right margin.

8002200

FEB 7 Ecc Mr. C. William Clark, Jr. The above changes do not change the technical basis for our acceptance of the design of the design features described in the topical report.

Sincerely,

'e t MMA e

Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management

Enclosure:

Topical Report Evaluation (revised pages 4 and 11)