ML19295E118
| ML19295E118 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 10/18/2019 |
| From: | Karaba P Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 19-0062 | |
| Download: ML19295E118 (1) | |
Text
~~~ Exelon Generation SVPL TR # 19-0062 October 18, 2019 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dresgen Nuclear Power Station, Units 1, 2 and 3 Facility Operating License No. DPR-2 Dresden Nuclear Power Station 6500 North Dresden Road Morris, IL 60450 10 CFR 72.48 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket No. 50-10, 50-237, 50-249, and 72-37
Subject:
1 O CFR 72.48 Evaluation Summary Report In accordance with the requirements of 10 CFR 72.48, "Changes, tests, and experiments,"
paragraph (d)(2), Exelon Generation Company, LLC is submitting a summary of completed changes, tests, and experiments for Dresden Nuclear Power.Station (DNPS). There were no 1 O CFR 72.48 evaluations completed for DNPS during the time period between November 1, 2017 to October 15, 2019.
There are no regulatory commitments contained in this submittal.
Should you have any questions concerning this letter, please contact Mr. Bruce Franzen at (815) 416-2800.
Peter J Karaba Site Vice President Dresden Nuclear Power Station cc:
Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - Dresden Nuclear Power Station 7E47
- JHSS 1-D
- Jtj5SZ(p jU((_/L
- JN5S