ML19295C020

From kanterella
Jump to navigation Jump to search
Forwards Util 730103 & 0504 Requests for Change to Permit Cycle 9 Operation & AEC of Authorization. W/O Encl
ML19295C020
Person / Time
Site: Dresden Constellation icon.png
Issue date: 10/05/1973
From: Skovholt D
US ATOMIC ENERGY COMMISSION (AEC)
To: Hamester H
ENVIRONMENTAL PROTECTION AGENCY
References
NUDOCS 8010150723
Download: ML19295C020 (1)


Text

-

I October 5, 1973 Docket No. 50-10 Mr. Hans L. Hamester ATTN: Joan Sause Office of Radiation Programs Environmental Protection Agency Room (47A East Tower, Waterside Mall 401 M Street, S. W.

Washington, D. C.

20460

Dear Mr. Hamester:

In accordance with an understanding between the Atomic Energy Commission and the Environmental Protection Agency, enclosed for your information are two copies of each of the following documents.

1.

Letters froza Commonwealth Edison Company dated January 3,1973, and May 4, 1973, requesting proposed change to permit operation of Cycle 9 for the Dresden Unit I reactor located in Grundy County, Illinois.

2.

Ltr to Consnonwealth Edison Company dated September 13, 1973, as Change No. 26 to License No. DPR-2 authorizing the above request.

Distribution Sincerely, Docket File AEC PDR i

ed N

RMDiggs, L:0RB #2 Donald J ovholt

/asistant Director for Operating Reactors Directorate of Licensing l-

Enclosures:

As stated cc w/ enclosures:

cmgrddal Gary W1hlamsjral..Activitieb..ha rf >

.d Mr.

L:0RB #2

/ ?> "'"

EnvfronmentalProbctionAgene suns 4q pit...Wacksr..Drival I DN8.s,: mg o4 8 h.8%. Illinois!, 60606 10/5/,73 Form AEC-St e tRev.9-53) AECM 0240 ero

.42-se-sions-a 64 ws 8 010150 7RO g