ML19295A642

From kanterella
Jump to navigation Jump to search
Recommends Gesmo Proceedings Be Completed.Technically Competent People Available to Complete Gesmo Project.Further Delay in Proceedings Will Increase Energy Costs.Gesmo Will Provide Basis for Future Decisons Re Spent Nuclear Fuel
ML19295A642
Person / Time
Site: West Valley Demonstration Project, 05000564, 07001327, 07001821, Barnwell, 07001432
Issue date: 09/13/1980
From: Heather Murray
AFFILIATION NOT ASSIGNED
To:
NRC COMMISSION (OCM)
References
RULE-RM-50-5-45FR53933 NUDOCS 8010020699
Download: ML19295A642 (1)


Text

..

/ -~

/

h()( hf(

<(

)

c)<' 3 2111 Louise Lane Billings, MT 59102 September 13, 1980 Chairman U.

S.

Nuclear Regulatory Cctaission Washington, D.C. 20555

Dear Sir:

The Generic Envircnmental Statement on Mixed Oxide fuels (GESMO) should M concleted.

'here are still technically competent people available at the present time.

If the study is further delayed it will cost more--besides, the information is needed now to provide the basis for future decisiens on the reprocessing of spent nuclear fuel.

Respectfully, Lc_. (

/

/

i

)

I

)

'gh Murray 801oonovtq