ML19295A210

From kanterella
Jump to navigation Jump to search
Forwards Utils Progress Repts Re Fire Protection Mods Per IE Bulletin 75-04A Requirements
ML19295A210
Person / Time
Site: Dresden, Cook, Quad Cities, Zion  Constellation icon.png
Issue date: 11/05/1976
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Goller K
Office of Nuclear Reactor Regulation
Shared Package
ML19295A211 List:
References
IEB-75-04A, IEB-75-4A, NUDOCS 8009290611
Download: ML19295A210 (1)


Text

[4/fh0 SUS.

tiOV 5 1970

.=

K. R. Coller, Assictant Director for Operating Reactors, DOR SCHEDULES FOR 1;ROUNS FERRY RELATED If0DIFICATIONS AT DRESDEN, QUAD CITIES, ZION /JiD COOK The enclosed progress reports from Co:r.onucalth Edison and American Electric Power are transmitted for your information.

These reports required by IE Eulletin 75-04A are related to fire protectisn nodifications (at the commonucalth Edicon plants) and alternate shutdos.n modifications (at Cook).

These are the only two licensees who are presently continuing to report non-cetpleti'.,a modifientions planned in response to IE Bulletins 75-04 snd 75-04A uhich dealt with follow-up of the Browns Ferry fire.

Orf:' al afsud by m

K. Sayfrit Karl V. Seyfrit, Chief Reactor Technical Ascistance Branch Office of Inspection and Enforcement i

Enclosurcs:

As stated cc w/cncis.:

J. G. Davis. IE G. Roy, IE G. Fiorelli, IE:III TVA Task Force Members T. Ippolito, DSS S~0 -to AfV RIP:955/F30222H1

.. IE_:RTAB IE:RTAB.

one.c r DKirkpa. trick Seyfrit..

Y k.

...!.f.h,.

l oavs >

term ALC.)t3 titer. 9 53) AICM 0240 W v. s. oove a.esar emmtens orrices e vra.sze.n ee 8009290 [/[

' ~ '