AUG 2 91980 Docket No. :
50-482 MEM0FANDUM FOR:
B. J. Youngblood, Chief, Licensing Branch flo.1, DL FROM:
Richard M. Stark, Project Manager, Licensing Branch No.1, DL
SUBJECT:
WOLF CREEK CASE LOAD FORECAST '
DATE AND TIME:
October 7 and 8, 1980 8:00 AM to 5:00 PM LOCATION:
Wolf Creek Site Burlington, Kansas PURPOSE:
flRC case load forecast panel meeting and site visit for The Wolf Creek site (see agenda)
PARTICIPANTS:
NRC Staff W. Lovelace, R. Stark, T. VanDell Kansas Gas & Electric Comoany A. Rathbun
. D( : k ue/,lhl-Q r%
': n '
Richard M. Stark, Project Manager Licensing Branch No. 1 Division of Licensing NOTE: Members of the public wishing to attend should contact Richard M. Stark at 301-492-7238 by September 15, 1980 so that arrangements can be made for their attendance.
0 800919
WOLF CREEK PROJECT CASELOAD FORECAST PANEL SITE VISIT MEETING AGENDA 1.
Overview of project construction schedule including progress and major milestones completed since Caseload Panel visit of November,1979, current problems and any anticipated problem areas that may impact the current projected fuel load date.
2.
Detailed review and current status of design and engineering effort (by major discipline) including any potential problems that may arise from necessary rework.
3.
Detailed review and current status of procurement activit;0s including valves, pipe, instruments, cable, major components, etc.
4.
Actual and proposed craft work force (by major craft), craft availability, productivity, potential labor negotiations and problems.
5.
Detailed review and current status of all large and small bore pipe hangers, restraints, snubbers, etc., including design, rework, procurement, fabrication, delivery and installation.
6.
Detailed review of project schedule identifying critical path items, near critical items, amount of float for various activities, the current critical path to fuel loading, methods of implementation of corrective action for any activities with negative float, and provisions for contingencies.
The estimated project percent complete as of September 30, 1980.
7.
Detailed review and current status of bulk quantities including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent complete for each, actual versus forecast installation rates, and basis for figures.
(a) Concrete (CY)
(b) Process Pipe (LF)
- Large Bore Pipe (2 1/2" and larc-')
- Small Bore Pipe (2" and smalier)
(c) Yard Pipe (LF)
(d) Large Bore Pipe Hangers, R9e+raints, Snubbers (ea)
-2_
(e) Small Bore Pipe Hangers, Restraints (ea)
(f) Cable Tray (LF)
(g) Total Conduit (LF)
(h) Total Exposed Metal Conduit (LF)
(i) Cable (LF)
- Power
- Control
- Security
- Instrumentation
- Plant Lighting (j) Terminations (ea)
- Power
- Control
- Security
- Instrumentation
- Plant Lighting (k) Electrical Circuits (ea)
- Power
- Control
- Security (1)
Instrumentation (ea) 8.
Detailed review and current status of preparation of preop test procedures, integration of preop test activities with construction schedule, system turnover schedule, preop test schedule, current and proposed preop test program manpower.
(a) Total number of procedures required for fuel load.
(b) Number of draft procedures not started.
(c) Number of draft procedures being written.
(d) Number of procedures approved.
(e) Number of procedures in review.
(f) Total number of preop tests required for fuel load.
(g) Number of preop tests completed.
(h) Number of preop tests currently in progress.
(i) Number of systems turned over to start-up.
. 9.
Detailed discussion of potential schedular influence due to changes attributed to tiUREG-0660, NUREG-0694 and other recent licensing requirements.
- 10. Site tour and observation of construction activities.
11.
Discussion of anf potential schedular impact due to flood damaged equipment at Wolf Creek site.
Mr'. Glenn L. Koester Vice President - Operations Kansas Gas and Electric Comcany 201 North Market Street P. O. Box 208 Wichita, Kansas 67201 cc:
Mr. Nicholas A. Petrick Ralph Foster, Esq.
Executive Director, SNUPPS Kansas Gas & Electric Company 5 Choke Cherry Road P. O. Box 208 Rockville, Maryland 20750 Wichita, Kansas 67201 Mr. Jay Silberg, Esquire William H. Ward, Esq.
Shaw, Pittman, Potts & Trowbridge MACEA 1800 M Street, N. W.
5130 Mission Road Washington, D. C.
20036 Shawnee. Mission, Kansas 66205 Mr. Donald T. McPhee Ms. Treva Hearne, Assistant General Counse Vice Presidnet - Production Public Service Commission Kansas City Power and Light Company P. O. Box 360 1330 Baltimore Avenue Jefferson City, Missouri P. O. Box 679 Kansas City, Missouri 64101 James T. Wiglesworth, Esq.
9800 Metcalf Suite 400 General Scuare Center Overland Park, Kansas 66212 Mr. William H. Griffin, Es.
Assistant Attorney General State of Kansas State House Topeka, Kansas 66612 Mr. John M. 'dylie, II Energy Reporter Kansas City Star 1729 Grand Kansas City, Missouri 64108 Mr. Gary Haden Wichita tagle and Beacon Box A-20 Wichita, Kansas 67201
MFETING NOTICE DISTRIBUTION SUG 2 S 1980 Docket File J. S tol z NRC PDR S. Hanauer Local PDR P. Collins TIC D. Vassallo NSIC D. Ziemann Branch File R. Mattson H. Denton R. Schroeder E. Case K. Kniel D. Eisenhut D. Skovhol t R. Purole G. Knighton T. Novak M. Ernst S. Varga R. Baer T. Ippoli to C. Berlinger P. A. Clark S. Israel R. Reid ACRS (16)
R. Tedesco Attorney, OELD J. Youngblood OIE (3)
A. Schwencer OSD (7)
Chief, Licensing Branch #3 Project Manager R. Stark J. R. Miller Licensing Assistant M. Rusnorook G. Lainas Receotionist D. Crutchfield TERA Chief, Systemic Evaluation Program Branch.
J. LeDoux, I&E Chief, Operating Reactors Assessment Branch R. Vollmer I&E Headquarters R. Bosnak I&E Region I F. Schauer I&E Region II R. E. Jackson I&E Region III G. Lear I&E Region IV V. Noonan ISE Region V S. Pawlicki V. Benaroya NRC
Participants:
Z. Rosztoczy W. Lovelace, R. Stark, T. VanDell W. Haass W. Hansen D. Muller R. Ballard W. Regan J. D. Sal tzman D. Ross P. Check R. Satterfield
- 0. Parr bcc: Applicant & Service List F. Rosa W. B.ler W. Kreger R. W. Hous ton T. Murphy W. Ga rrmi l l L. Rubenstein T. Sneis Chief, Core Performance Branch B. Grir:es H. Collins F. Pagano Emergency Preoaredness Deveicoment Branch