ML19294C263
| ML19294C263 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/31/1979 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| Shared Package | |
| ML19294C262 | List: |
| References | |
| NUDOCS 8003070391 | |
| Download: ML19294C263 (2) | |
Text
.
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDA!! NECK PLANT llADDAM, CONNECTICUT ANNUAL OCCUPATIONAL EXPOSURE REPORT FOR Tile PERIOD OF JANUARY 1, 1979 TO DECEMBER 31, 1979 DOCKET NO. 50-213 LICENSE DPR-61 8003070 i
e REGULATORY GUIDE 1.16 REPORT FOR 1979 CONN. YANVEE ATOMIC POWER CO.
NUMBER OF PERSONNEL (>100 MREM)
TOTAL PAN-REP!
STATION UTILITY OTilER STATION UTILITY OTilER WORK & JOB FUNCTION EMPLOYECS EffPLOYEES EMPLOYEES EMPLOYEES EMPLOYEES EMPLOYEES REACTOR OPERATIONS & SURVEILLANCE MAINTENANCE PERSONNEL 4
2 3
3.90 0.30 1.04 OPERATING PERSONNEL 31 0
15 22.64 0.16 8.20 IIEALT!I Pl!YSICS PERSONNEL 6
1 39 4.43 0.20 16.08 SUPERVISORY PERSONNEL 0
0 1
0.00 0.00 0.16 ENGINEERING PERSONNEL 0
0 1
0.31 0.27 0.75 ROUTINE MAINTEN.1NCE MAINTENA?;CE PERSONNEL 29 113 98 51.13 75.33 84.90 OPERATING PERSONNEL 22 2
56 6.87 0.33 15.99
!!!: ALT!! PilYSICS PERSONNEL 15 0
115 13.74 0.37 69.57 SUPERVISOPY PERSONNEL 0
1 0
0.00 0.63 0.01 ENGINEERING PERSONNEL 6
3 25 1.28 1.76 29.81 INSERVICE INSPECTION MAINTENANCE PERSONNEL 2
0 14 1.02 0.11 9.31 OPEPATING PERSONNEL 13 0
2 4.07 0.09 2.07 IIIALTit PllYSICS PERSONNEL 1
0 1
0.39 0.01 0.62 SUPERVISORY PERSONNEL 0
0 0
0.00 0.00 0.00 ENGINEERING PERSONNEL 1
2 15 0.43 1.05 9.81 SPECI AL PAINTENANCE PAINTENANCE PERSONNEL 9
17 183 3.20 7.37 106.80 OPERATING PERSONNEL 2
2 10 1.08 1.36 4.29 ilEALT!! PilYSICS PERSONNEL 7
0 45 1.48 0.17 17.70 SUPERVISOPt PERSONNEL 0
1 2
0.00 0.22 1.20 ENGINEERING PERSONNEL 2
12.
35 0.92 4.45 19.39 WASTE PROCESSING MAINTENANCE PERSONNEL 4
3 6
2.00 0.46 2.20 OPEf'ATING PERSONNEL 16 0
1 5.06 0.00 0.26 IfEALTil Pl!YSICS PERSONNEL 6
0 47 2.58 0.00 35.52 SUPERVISORY PERSONNEL 0
0 0
0.00 0.00 0.00 ENGINEERING PERSONNEL 1
0 1
0.13 0.00 0.20 PIFUELING MAINTEN ANCE PERSONNEL 23 75 78 12.71 40.61 77.98 CPERATING PERSONNEL 26 3
5 21.01 2.09 4.79 IIEALTil Pl!YSICS PERSONNEL 4
0 65 1.16 0.20 50.84 SUPERVISORY PEP.SONNEL 0
0 0
0.00 0.00 0.00 ENGINEERING PERSONNEL 2
3 33 1.03 1.28 52.86 TOTAL MAINTENANCE PERSONNEL 71 210 372 73.98 124.17 282.23 OPERAT!NG PERSONNEL 110 7
89 60.73 4.02 35.60 IIEALTI! Pl!YSICS PERSONNEL 39 1
312 23.78 0.96 190.33 SUPERVISORY PERSONNEL 0
2 3
0.00 0.85 1.37 ENGINEERING PERSONNEL 12 20 110 4.10 8.81 112.82 GRAND TOTAL 232 240 886 162.59 138.83 622.35 6
1