Forwards 800129 Ltr Re Delayed Submittal of Revised Inservice Testing Program
ML19294B968
Person / Time
Site: Beaver Valley
Issue date: 02/28/1980
From: Dunn C
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8003060465
Download: ML19294B968 (1)


Text

4

'Af (412) 456-6000 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 February 28, 1980 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A . S chwencer, Chief Operating Peactors Branch No. 1 Division of Operating Reactors Washington, D. C. 20555

Reference:

Beaver Valley Power S tation, Unit No. 1 Docket No. 50-334 Delayed Submittal of Revised In-service Testing Program Gentlemen:

Based on conversati Detween the NRC staff and our staff it appears that the subject letter has not been received by your office. A copy is attached.

Yours very truly,

,1' 'ls a n y,,,g, C. N. Dunn Vice President, Operations attachment fools

///

80 03 0 00 +65

<@$o+

m I?8 DuquesneUgit ,,,,, _

435 54ath Avenwo January 29, 1980

[00"^ "

Director of Nuclear Reactor Regulation -

United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, D. C. 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Delayed Submittal of Revised In-Service Testing Program Gentlemen:

A meeting was conducted at Beaver Valley on December 12,13 and 14, 1979, for the purpose of reviewing the previously submitted In-Service Test Program as it relates to ASME Code Section XI requirements. As a result of that meeting, Duquesne Light agreed to submit a revised IST Program, incorporating comments from the meeting, by January 30, 1980.

Due to unforeseen personnel requirements necessary to support the current refueling and extensive plant modifications outage, the revised program will not be available on January 30, 1980. It is requested that the submittal date be extended 45 days until March 14, 1980, at which time, the revised IST Program will be completed.

Very truly yours, C. N. Dunn Vice President, Operations P UF' .,o p c:c , 0 b' t