Responds to Re Action Plan Concerning Seismic Design.Outlines Proposed Resolution,Including Developing List of floor-mounted safety-related Electrical Equipment Using Inservice Insp Program
ML19294B647
Person / Time
Site: Dresden 
Issue date: 02/29/1980
From: Janecek R
COMMONWEALTH EDISON CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 8003050214
Download: ML19294B647 (2)


Text

"

Commonwealth Edison one First National Plaza Chicago, liknois Address Reply to Post Offico Box 767 Chicago. Illinois 60690 February 29, 1980 Mr. D.

L.

Ziemann, Chief Operating Reactors - Branch 2 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Dresden Station Unit 1 Action Plan Concerning Seismic Design NRC Docket No. 50-10 Reference (a): D.

G. Eisenhut letter to D.

L.

Peoples dated January 1,

1980

Dear Mr. Ziemann:

The following action plan is proposed for resolution of the issue raised in Reference (a) for Dresden Unit 1.

1.

Develop a list of floor mounted safety related electrical equipment using the Inservice Inspection Program P&ID's and the SEP listing of safety related electrical equipment transmitted to the NRC on December 1, 1978 as the basis for the safety related electrical equipment listing.

2.

Field review each of the items on the list and determine if positive anchorage exists.

(An undocumented random spot check indicates positive anchorage does exist.)

3.

Provide the results of this review to the NRC by March 10, 1980.

4.

Dresden Unit I was designed for static earthquake loads, therefore the question of whether or not the anchorage system has been engineered with adequate capacity will be included in the seismic reevaluation of the plant.

This issue will be addressed prior to plant start-up from the current outage.

8 o osos o 2-((f.

Commonwealth Edison M r. D.

L.

Ziemann, Chief February 29, 1980 Page 2 5.

During the course of the review in step 4 a random sample test of anchors will be made to determine the quality of the installed anchorage system.

6.

A general review of Dresden 2 is being made in regards to non-seismic Category I auxiliary items.

The results of this review will be implemented on Dresden 1 prior to the unit returning to service.

Please address any questions you may have concerning this matter to this office.

One (1) signed orignal and thirty-nine (39) copies of this transmittal are provided for your use.

Very truly yours,

/

cff ame'f Robert F.

Janecek Nuclear Licensing Administrator Boiling Water Reactors 2111A