Text
u 'l a n
.. i'
/
P ~ PortlandGeneralElectricCompany 4
G f, RECDVE0 :f-JAN 71980 a
Cttr es Gcen. j eest v.ce p%c.mt
-i "A
~
C December 31, 1979 g
Trojari Nuclear Plant U
g Docket 50-344 License NPF-1 Mr. R. H. Engelken, Director U. S. Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1990 N. Calit >rnia Blvd.
Walnut Creek, CA 94596
Dear Sir:
In accordance with our letter of September 14, 1979 responding to IE Bulletin 79-OlA concerning the use of ASCO solenoid valves in safety-related systems at the Trojan Nuclear Plant, we are providing the attached list of ASCO valves that we intend to replace with functionally equivalent NP-1 type ASCO solenoid valves. Our letter of September 14, 1979 noted that it may be necessary to block isolation of the Containment instrument air supply in order to provide an air source for operation of these valves. We have since determined tha!., if needed at all, these valves do not have to be available until sometime after a postulated Safety Injection Signal,has been reset. Therefore, there is no need to block isolation of the' air supply.
Adequately qt alified ASCO NP-1 solenoid valves require a minimum of 14 weeks for purchase and acquisition.
Every effort will be made to procure and install these valves prior to startup of Cycle 3 refueling.
If you have any questions concerning this information, please contact me.
Sincerely, C. Goodwin, Jr.
Assistant Vice President Thermal Plant Operation and Maintenance Cc/SML/4mglB2 Attachments c:
Mr. Lynn Frank, Director State of Oregon Department of Energy 3 0 02 2 8 016 l
'O 5 w SJmon EPeet poeni Oegan 9720:
7 'i J c
Page 1 of 4 Attachment No. 1 Decetaber 31, 1979 TROJAN NUCLEAR PLANT ASCO Solenoid Valves Iocated Inside Containment Requiring Replacement Per hTC IE Bulletin 79-01A Pilot Solenoid Controlled Present Valve Valve ASCO Coil Class Containment No.
Description System Model No.
Type IE / Isolation SV455AA Pressurizer Power-Reactor Coolant System LB831654 B
Yes/No Operated Relief (RCS)
SV455AB Pressurizer Power-Reactor Coolant System LB831654 B
Yes/No Operated Relief (RCS)
SV456A Pressurizer Power-Reactor Coolant System LB831654 B
Yes/No Operated Relief (RCS)
SV456B Pressurizer Power-Reactor Coolant System LB831654 B
Yes/No Operated Relief (RCS)
SV459 Normal Letdown to Chemical and Volume LB831654 B
Yes/No Regenerative lleat Control bystem (CVCS)
Exchanger SV460 Normal Letdown to Chemical and Volume LB831654 B
Yes/No Regenerative IIcat Control System (CVCS)
Exchanger SV469 Pressurizer Relief RCS and CVCS LB831654 B
Yes/No Tank to Containment Gas Collection IIcader SV2285 Steam Generator A Steam Generator ilB8320A90 11 No/No Water Sample Valve SV2286 Steam Generator A Steam Generator HB8320A90 11 No/No Water Sample Valve SV2287 Steam Genreator B Steam Generator llB8320A99 11 No/No
Page 2 of 4 Attachment No. 1 December 31, 1979 TROJAN NUCLEAR PLANT ASCO Solenoid Valves Located Inside Containment Requiring Replacement Per NRC IE Bulletin 79-OlA Pilot Solenoid Controlled Present Velve Valve ASCO Coil Class Containment No.
Description System Model No.
Type IE / Isolation SV2288 Steam Generator B Steam Generator HB8320A90 H
No/No Water Sample Valve SV2290 Steam Generator C Steam Generator HB8320A90 H
No/No Water Sample Valve SV2291 Steam Generator C Steam Generator HB8320A90 H
No/No Water Sample Valve SV2292 Steam Cencrator D Steam Generator HB8320A90 H
No/No Water Sample Valve SV2293 Steam Generator D Steam Generator HB8320A90 H
No/No Water Sample Valve SV8026 Pressurizer Relief Process Sampling ( )
v FT8320A101 F
Yes/Yes Tank to Auto Gas Analyzer SV8030 Primary MLI Water to
,RCS LB831654 B
Yes/No Pressurizer Relief Tank SV8031 Pressurizer Relief RCS LB831654 B
Yes/No Tank to Reactor Coolant Drain Tank (RCDT)
SV8141A Reactor Coolant Pump CVCS LB831654 B
Yes/No (RCP) 2 Seal Leakage Line (1) Engineered safety feature per FSAR Chapter 6
Page 3 of 4 Attachment No. 1 December 31, 1979 TROJAN NUCLEAR PLANT ASCO Solenoid Valves Located Inside Containment Requiring Replacement Per NRC IE Bulletin 79-01A Pilot Solenoid Controlled Present Valve Valve ASCO Coil Class Containment No.
Description System Model No.
Type IE / Isolation SV8141B Reactor Coolant Pump CVCS LB831654 E
Yes/No (RCP) 2 Seal Leakage Line SV8141C Reactor Coolant Pump CVCS LB831654 B
Yes/No (RCP) 3 Seal Leakage Line SV8141D Reactor Coolant Pump CVCS LB831654 B
Yes/No (RCP) 4 Seal Leakage Line SV8142 RCP Seals Bypass CVCS LB831654 B
Yes/No IIcader SV8143 Excess Letdown Divert CVCS 1
LB831654 B
Yes/No to RCDT SV814.'
Pressurizer Auxiliary CVCS LB81654 B
Yes/No Spray SV8146 Charging Line CVCS LB831654 B
Yes/No Isolation SV8147 Charging Line CVCS LB831654 B
Yes/No Isolation SV8149A Letdown Orifice CVCS Fr831654 F
Yes/Yes Isolation SV8149Al Letdown Orifice CVCS FT831654 F
Yes/Yes Isolation 9
Page 4 of 4 Attachment No. 1 December 31, 1979 TROJAN NUCLEAR PLANT ASCO Solenoid Valves Located Incide Containment Requiring Replacement Per NRC IE Bulletin 79-01 A Pilot Solenoid Controlled Present Valve Valve ASCO Coil Class Containment No.
Description System Model No.
Type IE / Isolation SV8149B Letdown Orifice CVCS FT831654 F
Yes/Yes Isolation SV8149B1 Letdown Orifice.
CVCS FT831654 F
Yes/Yes Isolation SV8149C Letdown Orifice CVCS FT831654 F
Yes/Yes Isolation SV8149C1 Letdown Orifice CVCS FT831654 F
Yes/Yes Isolation SV8153 Excess Letdown Line CVCS LB831654 B
Yes/No SV8154 Excess Letdown Line CVCS LB831654 B
Yes/No SV8168A Primary Makeup Water CVCS FT8320A101 F
Yes/No to RCP 1 Seal 3 SV8168B Primary Makeup Water CVCS FT8320A101 F
Yes/No to RCP 2 Seal 3 SV8168C Primary Makeup Water CVCS FT8320A101 F
Yes/No to RCP 3 Seal 3 SV8168d Primary Makeup Water CVCS FT8320A101 F
Yes/No to RCP 4 Seal 3 J
SML/4mg2A1 e
9