Responds to IE Bulletin 79-24 Re Frozen Lines.Several safety-related Process,Instrument & Sampling Lines Found to Be Subject to Freezing in Cold Weather.Design for Permanent Encl Incomplete.Temporary Measures Will Be Taken
ML19294B344
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 10/23/1979
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
IEB-79-24, NUDOCS 8002280223
Download: ML19294B344 (1)


Text

T/G Portland General ElectricCompany Y

cna es ccm.,n J-C nr t V& -

w ra October 23, 1979 Docket flo. 50-344 Mr. R. H. Engelken, Director US Nuclear Regulatory Cormiission, Region V 1990 North California Blvd.

Walnut Creek, California 94596

Dear Sir:

NRC IE Bulletin 79-24 requested that operating plants review their design to determine that adequate protective measures have been taken to assure that safety-related process, instrument, and sampling lines do not Ireeze during extremely cold weather. We have previously reviewed the design of Trojan as the result of the unusually cold weather that was experienced during the 1978-1979 winter.

Several safety-related process, instrument and sample lines located in the exposed facade area between the containment and Turbine Building were found to be subject to freezing condition during cold weather.

The design of a permanent enclosure for this area is in progress but will not be completed before the onset of cold weather this winter.

In the interim period, we will install temporary heat tracing on those safety-related lines subj ec t to freezing and a temporary enclosure at the entrance to the facade area to reduce the air flow and associated chill factor in the area.

This action will be completed by November 25, 1979.

Sincerely, x;

C. Goodwin, Jr.

Assistant Vice President Thermal Operations & Maintenance CG na c:

J. L. Williams D. J. Brochl R. L. Sullivan b

R istensen g'A

,s Nuclear Operations Board Trojan Operating Committec

@M 1'i Plant Review Board J. W. Lentsch N

.A 5

Office of Management Information and Program Contro'

. E"h' L. Frank, Director, DOE /EFSC

/ J,s -

'7f,J.u-[

MRC Resident Inspector 7.n f 7g7g 800028 1 N 0