ML19294B310

From kanterella
Jump to navigation Jump to search
Forwards Structure & Component Drawings Per NRC 791219 Request for Addl FSAR Info.List of Drawings Will Be Added to FSAR W/Subsequent Amend.Drawings Available in Central Files Only
ML19294B310
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 02/08/1980
From: Naughton W
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19294B311 List:
References
NUDOCS 8002280165
Download: ML19294B310 (8)


Text

"

Commonwealth Edison One First National Plaza Chicago.1:hnois Address Reply to. Post Office Box 767 Chicago. Illinois 60690 February 8, 1980 Dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Response to NRC Request for Additional FSAR Information NRC Docket Nos. 50-454, 50-455, 50-456 and 50-457

Dear Dr. Denton:

Per a request from Mr. C.

W.

Moon of your staff during a meeting held in the Sargent and Lundy Offices on December 19, 1979, Commonwealth Edison hereby transmits the drawings listed in the attachment to this letter.

These drawings were selected with the concurrence of R. E.

Lipinski of y0ur staff and representatives of the Idaho National Laboratory durl'g the aforementioned meeting.

The structure and component drawings contained in this submittal are those of the Byron Station River Screen House, Auxiliary Building, Containment Building, Fuel Handling Building and Pipe Whip Restraints.

A list of these drawings will be added to the FSAR with a subsequent amendment.

One (1) signed original and thirty-nine (39) copies of this letter are transmitted for your use.

Per Mr. Moon's request, four (4) sets of drawings are being transmitted under separate cover for NRC Staff's use.

In addition, two (2) copies are Deing transmitted directly to Idaho National Laboratory for their use.

Very truly yours, William F. Naughton Nuclear Licensing Administrator Pressurized Water Reactors Attachment cc:

C. Obenchain 1761A 8 0022 e o /63-

STRUCTURAL DRAWINGS for the NRC STRUCTUllAL RI:V11:N 1-28-80 DRAWING NO.

REVISION DATE S-401-BY H

05SEP79 S-402-BY II 05DEC77 S-403-BY K

120CT78 S-404-BY N

OlFEB79 S-405-BY J

26FEB'/9 S-406-BY F

24APR78 S-407-BY E

210CT77 S-408-BY P

02MAY79 S-412-BY F

02AUG77 S-413-BY 11 03 MAR 78 S-414-BY D

10MAY77 S-415-BY F

24'AUG77 S-416 G

13JUL78 S-f70 H

210CT77 S-671 J

20 DAN 78 S-672 AB 02JUL79 S-673 V

02 MAR 79 S-674 K

18Dl:C7 8 S-675 Z

300cT79 S-676 L

18DEC78 S-679 Y

20NOV79 S-680 Y

08AUG79 S-691 P

050CT79 S-682 U

llDEC79 S-683 R

050CT79 S-684 K

22FEB78 I

h =1-TA C VI H S A) Y page 1 of 7

.a:

DRAWING NO.

REVISION DATE S-685 M

050CT79 S-p86 L

02JUL79 S-687 K

24JAN79 S-690 Y

20JUL79 S-691 AK 20NCV79 S-692 L

17APR78 S-693 K

17APR78 S-695 0

31MAY79 S-696 AP 20NOV79 S-697 AL llDEC79 S-698 U

31MAY79 S-699 W

20NOV79 S-700 T

16NOV78 S-701 AD 20JUL79 S-702 D

23AUG78 S-715 L

16 MAR 78 S-716 T

25MAY78 S-717 W

210CT77 S-718 AF 02JUL79 S-720 AA 30t1AY78 S-721 AH llDEC79 S-723 N

050CT79 S-724 U

llAPR78 S-726 M

16 MAR 78 S-727 J

07JUN78 S-728 W

31MAY79 A

FA YTA C HM ENT fh4dl 2 of 7

~

DRAWING NO.

REVISION DATE S-729 W

20JUL79 S-k31 V

07DEC78 S-732 T

02JUL79 S-734 G

16 MAR 78 S-735 J

07JUN78 S-737 P

26JAN77 S-738 Z

08AUG79 S-739 P

28 MAR 79 S-740 AC llDEC79 S-741 AA 02JUL79 J

S-742 AC 050CT79 S-744 AA 02JUL79 S-745 AA 300CT79 S-747 U

02JUL79 S-748 AA 300CT79 S-750 K

16 MAR 78 S-810 J

13JAN78 S-811 S

090CT79 S-812 V

090CT79 S-813 N

050CT78 S-816 T

22AUG79 S-817 G

26DEC79 S-818 G

29JUL77 S-819 H

24 MAR 78 S-820 R

23AUG78 S-821 L

26DEC79 ANTTAC N ea r.

Pat.

3 or 7

DRAWIt1G t10.

REVISIOri DATE S-822 L

26DEC79 R

27JUL7 9 S(823 S-876 Z

04DEC79 S-877 S

06NOV79 S-882 D

10 AUt;7 6 S-883 F

12APR77 S-884 F

21 J UtJ7 8 S-886 D

28FMH77 S-904 S

06NOV79 S-905 M

08MAY78 S-906 Z

26DMC79 S-907 T

06SMP79 S-910 AF 26DMC79 S-911 AC 27DEC79 S-914 R

26DEC79 S-915 R

26DEC79 S-918 AA 27DHC79 AE 76DHC79 j-- 919 S-923 J

lOJUL78 S-924 J

27DEC79 S-1019 D,,

27J UL7 7 S-1020 C

14JUN77 S-1021 E

28SEP79 S-1067 L

25MAY78 S-1071 J

25MAY78 S-1072 L

25MAY78 A/t*T~TACits 5.,J r 9Afd 4 of 7 e

DRAWING NO.

REVISION DATE S-1073 G

06SI:P7 9 S-1074 K

10AUG79 S-1075 P

25MAY78 S-1076 G

30JAN78 S-1077 11 26DEC79 S-1078 0

04NOV/8 S-1081 II 01JUN79 S-1082 D

2 61)lT / 9 S-1286 Y

20SEP/9

\\

S-1287 G

13DFC77 S-1288 T

06SEP79 S-1289 W

050CT79 S-1290 Y

20JUL79 S-1291 P

06AUG79 S-1292 S

llDEC79 S-1293 AJ 00AUG79 S-1294 AG 11DEC79 S-1295 R

11DEC79 S-1296 AB 20NOV79 S-1297 AB 1]DEC79 S-1298 AC..

20NOV79 S-1299 M

050CT79 S-1301 W

06SEP79 S-1302 AH 08AUG79 S-130)

AM llDEC79 S-1304 V

06SEP79 AHTTACHME Or fAW.

5 of 7

DRAWING NO.

REVISION DATE S-1306 T

..lDEC79 S-1309 AA 20JUL79 S-1310 AA 18AUG79 S-1331 AC 20NOV79 S-1312 Y

20JUL79 S-1313 W

05FEB79 S-1314 0

07NOV79 S-1315 Y

05FEB79 S-1316 K

300CT79 S-1317 P

05 fen 79 S-1318 AC 20NOV79 S-1319 R

05FF.B79 S-1320 R

05FEB79 S-1321 V

11MAY79 S-1322 S

5FEB79 S-1324 Y

11DEC79 S-1325 U

20JUL79 S-1326 W

11DI:C7 9 S-1327 P

07NOV79 S-1328 R

12APR79 S-1329 L

28f1AR79 S-1330 P

28 MAR 79 S-1332 J

13NOV78 S-1333 T

21DEC77 S-1334 H

04JAN78 gg S-1416 H

27JUN79 ME 6 of 7

DRAWING NO.

REVISION DATE S-1417 R

27JUL79 S-1418 N

26DEC79 S-1419 D

050CT78 S-1420 11 050CT78 S-1421 F

06SEP79 S-1650 J

OlAUG79 S-1653 K

27JUN79 4 [h/24W84PJ ppgp pa g M

01AUG79 S-1654 D

27JUN79 S-1664

\\

S-1667 II OlAUG79 S-1668 K

OlAUG79 4

e 4

TTACHM(y7 Peoc 2 or 7 O