i Proposed Change No. 75 MAME"~> HARHEE W L :.2
=
j TURNPIKE ROAD (RT. 9) g, S 7~
ENGINEERING OFFICE WESTBORo, MASSACHUSETTS 01581 g
617-366-9011
__ g February 22, 1980 B.3.2.1 miY 80-27 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Office of Nuclear Reactor Regulation
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) USNRC Letter to MYAPC r.ated October 18, 1979 (c) MYAPC Letter to USNRC dated November 20, 1979
Dear Sir:
Subject:
Revision to Maine Yankee's Te'cenical Specifications -
Section 4.6 Periodic Testing Proposed Change Reference is made to the Technical Specifications contained in Appendix A to Operating License No. DPR-36 issued to the Maine Yankee Atomic Power Company for the Maine Yankee Plant. We propose to revise those specifications as follows:
1.
Delete current section 4.6 (Periodic Testing) pages 4.6-1, 4.6-2 and 4.6-3 2.
Replace deleted pages with replacement section 4.6 pages 4.6-1, 4.6-2, 4.6-3 and 4.6-4, revised to include auxiliary feedwater flow path verification and proper valve positioning prior to plant restart.
Revised section 4.6 is provided as Attachment A.
Reason for Change Maine Yankee Atomic Power Company was requested in Reference (b) to propose additional auxiliary feedwater system technical specifications relative to flow testing, and system valve alignment.
Reference (c) included Maine Yankee's commitment to submit the requested proposed change. The purpose, therefore, of this submittal is to fulfil that commitment.
Safety Considerations This change is submitted at the request of the USNRC and is not considered to constitute an unreviewed safety question. This change has been reviewed by the Nuclear Safety Audit and Review Committee.
,c\\
21 0 4 37
- n. pc0 i
s United States Nuclear Regulatory Commission February 22, 1980 Office of Nuclear Reactor Regulation Page ?
Fee Determination This change is submitted at the request of the USNRC, is administrative in nature, and as such will not require technical review and; therefore, no fee is included.
Schedule for Change This change will be incorporated into Maine Yankee's technical specifications immediately upon commission approval.
We trust this information is acceptable to you; however, should you have any questions, please contact us.
Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY Nr9: L, D. E. Vandenburgh Vice President Enclosure COMMONWEALTH OF MASSACHUSETTS)
)ss.
COUNTY OF WORCESTER
)
When personally appeared before me, D. E. Vandenburgh, who being duly sworn, did state that he is Vice President of Maine Yankee Atomic Power Company, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Maine Yankee Atomic Power Company, and that the statements therein are true to the best of his knowledge and belief.
m R. H. Groce Notary Public My Commission Expires September 14, 1984 y+.w.$fA%o
_s s
sF?'t a
n
.', t 1-I'
/, i y ?4 N
S a.
........... " '