Forwards Revised Cycle 4 Reload Licensing Schedule Re Use of Westinghouse Fuel in C-E Reactor
ML19294A957
Person / Time
Site: Millstone 
Issue date: 02/14/1980
From: Counsil W
NORTHEAST UTILITIES
To: Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8002260455
Download: ML19294A957 (2)


Text

.

..y IMHtTHI!AST UTII.ITiliS y

[C 'M 7" 77.s bs pon0 coNNEC11 CUT 06101

^

s x 27

";;. = ::"l P /dl' a m)ece-esti I

L L

J

.,;::"1';7 ";;;

February 14, 1980 Docket No. 50-336 Director of Nuclear Reactor Regulation Attn:

Mr. R. W. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission Washing ton, D. C.

20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Licensing Schedule for Cycle 4 Reload A meeting was held at the NRC Staff's offices in Bethesda on January 26, 1980 at which time a licensing schedule for the Cycle 4 reload of Millstone Unit No. 2 utilizing Westinghouse fuel was presented.

Since that time, seyeral events have occurred which have resulted in the need to revise this schedule.

In an effort to keep the Staff informed, Northeast Nuclear Energy Company (NNECG) provides the attached schedule identifying the dates at which various submittals will be made available to the Staff for review. Also included in the schedule are dates by which NNECO anticipates certain licensing actions will.

be completed by the Staff to support the scheduled startup date.

In light of the unique circumstances involving the upcoming Cycle 4 at Millstone Unit No. 2, in that this will be the first instance in which Westinghouse fuel is utilized in a Combustion Engineering (CE) reactor systera. Additional calendar time beyond that normally allocated for Staff review will be provided to preclude licensing delays to the Startup of Cycle 4.

Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY

,?

]

Y/

l 1& %

W.

G'.

Counsil Vice President Attachment 0

gone260 4,.57 i

  • w, MILLSTONE UNIT NO. 2

~

CYCLE 4 LICENSING SCHEDULE SCHEDULE CURREhI AS OF 1/26/79 SCHEDULE NRC MEETING (2/1/80)

"?RE-SU"MITTAL MEETINGS WITH NRC (ECCS MODELS) 3/15/79 & 5/1/79 SUBMIT W ECCS MODELS TO NRC (WCAP-9528) 6/79 6/11/79 SMALL BREAK MODEL ADDENDUM TO WCAP-9528 10/15/19 NRC REVIEW COMPLETION DATE (LARGE & SMALL BREAK MODELS) 11/79 3/31/80 BASIC SAFETY REPORT (BSR) 2/1/80 2/29/80 PROPOSED MEETING WITH NRC STAFF 3/12/80 (approx.)

LARGE AND SMALL BREAK ECCS ANALYSIS SUBMITTAL 4/80 4/1/80 BSR ADDENDUM - NUCLEAR UNCERTAINTIES 4/15/80 RELOAD SAFETY EVALUATION 5/1/80

$/1/80 CYLLE 4 CRITICALITY 8/80 9/1/80