Notification of RO-79-05/1P on 790226:target Rock Safety Relief Valve (1-MS-3F) Failed to Open During Power Ascension.Caused by Valve Lifting Prematurely.Investigation Results Will Be Included in Followup 14-day Rept
ML19294A784
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/26/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
MP-1-1129, NUDOCS 7903220137
Download: ML19294A784 (1)


Text

WO sc:nsmsr amurnas 2.??J.P, y

n-g Febrwry 26, 1979 MP 1I 29 W. Boyce H. Grier Director. Region I Office of Insp.ction & Enforcar=nt U. 5. Nuclear Regulatory Comission.

631 Park A'eenue King of Prussia. PennsyTTEnf a 19406

Reference:

Provisinnal License DPR-21 Docket Pio. 50-245 Reportable Occurrence R0-79-05/IP

Dear Mr. Grier:

This letter is forwarded to provide prtrot notification of Reportable Occurrence R0-7$-05/IP as required by the Millstone Unf t 1 Technical Spect fications.

On February 76, 1979 at 0205 hours0.00237 days <br />0.0569 hours <br />3.38955e-4 weeks <br />7.80025e-5 months <br />, during ree-r ascension, a Tervet Pnck Safety / Ret ter Valva (1-PG-3r) lifted prmturely and feiled to rescat at the reset pressure.

This resulted in an uncontrolled blowdown in which the Technical Specification nonm1 cooldown rate limit of 100 dagrees per hour was exceeded by 5 degrees.

Results of the invee,tigat fon into the incident and further analysis wfil be included in the followup 14 day report.

Yours truly,

  • hi d

J. F. Opaka Station Superintendant Millstone Nuclear Power Station JFD/RHY:11m cc:

pf rector, Orrice of Inspection and Enforcecont, Washington. D.C.

(30)

Director. Office of Managerent Inforrution and Program Control.

Washington, D.C. (3)