ML19294A735
ML19294A735 | |
Person / Time | |
---|---|
Site: | 05000471 |
Issue date: | 02/06/1979 |
From: | Corkin C MASSACHUSETTS, COMMONWEALTH OF |
To: | Callihan A, Cole R, Luton E Atomic Safety and Licensing Board Panel, UNION CARBIDE CORP. |
References | |
NUDOCS 7903130019 | |
Download: ML19294A735 (1) | |
Similar Documents at 05000471 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20059M8421990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20151V9791988-07-28028 July 1988 Partial Response to FOIA Request for Documents Re Plant.App a Documents Encl & Available in PDR ML20206F3261986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in Pdr.W/O App B & C Documents ML20206F3301986-06-13013 June 1986 Further Response to FOIA Request for Six Categories of Documents Re Facilities.App a Documents Available in Pdr.App B & C Documents Encl.Documents Also Available in PDR ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20055A2601982-05-28028 May 1982 Responds to FOIA Request for Documents Re Requests by Licensees for Exemption or Extension Beyond 820201 Date Specified by Final Rule,Commission Analysis,Comments,Or Actions Re Emergency Planning.Forwards App a Documents ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC 820415 Ltr.Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML20062J3251980-09-30030 September 1980 Discusses Emergency Planning Regulations,In Response to Re L Boyd Concerns.Fema Is Responsible for Adequacy of Emergency Preparedness in States & Communities Around Nuclear Plants ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML19323A8721980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML19323A8681980-04-30030 April 1980 Forwards Semiannual Marine Ecology Rept 15,Jan-Dec 1979. ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 1994-12-13 Category:INCOMING CORRESPONDENCE MONTHYEARML18011B1361994-12-13013 December 1994
[Table view]Responds to NRC RAI Re BWR Core Shroud Generic Safety Assessment Re Conductivity by Fuel Cycle.Ge Rept Providing Info W/Alpha Designations in Place of Plant Names Encl.Ge Ltr,Also Encl,Provides Plant Names.Encl Withheld ML20099J8141984-04-25025 April 1984 FOIA Request for Documents Re Electrical Relay Failures Including Class 1E Relay Failures at Listed Plants & Utilization of GE Type Hfa 51 Series Ac Relays or Other Relays Using Lexan as Coil Spool Matl ML20027A8911982-09-22022 September 1982 FOIA Request for NRC Preliminary & Final Calculations of Reactor Accident Consequence Results for Facilities ML20086Q7091982-07-28028 July 1982 Forwards Analyses of Antirotation Pin & Impeller Ring Wear, Per Request.Encl Info Should Be Treated as company- Sensitive ML20051P0041982-05-0707 May 1982 Advises of Util Position Declining to Pay Charges Asserted in NRC 820415 Ltr.Charges W/O Regulatory Basis.Other Reasons for Declining Asserted in Pending Case of New England Power Co Vs NRC ML20042B7141982-03-19019 March 1982 Forwards Endorsements 66 & 67 to Nelia Policy NF-188 ML20042B4561982-03-19019 March 1982 Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML20042B7091982-03-16016 March 1982 Forwards Endorsement 8 to Nelia Binder EB-31 & Endorsement 65 to Nelia Policy NF-188 ML20041B2091982-02-17017 February 1982 Forwards Endorsement 50 to Maelu Policy MF-58 ML20010J4681981-09-30030 September 1981 Forwards Endorsements 47 & 48 to Maelu Policy MF-58 ML20009H6841981-08-0303 August 1981 Forwards Updated Population Data & Description of Road Network Improvements Projected During First Yr of Plant Operation,In Response to NRC 810724 Request Re Evacuation Time & Population Estimates ML20010C5851981-05-27027 May 1981 Advises That Because of M Cleeton Medical History,Any Extra Radiation Would Pose Risk.Certificate of Svc Encl ML20004B6901981-05-19019 May 1981 Forwards AR & MW Cleeton Exceptions to ASLB Partial Initial Decision ML19347E9231981-05-11011 May 1981 Forwards Endorsements 45 & 46 to Maelu Policy MF-58 ML20008F9011981-05-0606 May 1981 Clarifies Response to 10CFR50.34(e) Provided in PSAR Amend 43 Per 810506 Request.Test Date & Analysis Will Include Igniter Performance & Endurance Characteristics If Option Chosen Continues to Be Deliberate Ignition Sys ML19347E5171981-05-0505 May 1981 Clarifies Statement in 810429 PSAR Amend 43 Re Containment Sys Design Integrity,In Response to NRC 810505 Telcon Request ML20004F3831981-04-30030 April 1981 Forwards Util Latest Annual Rept,Portions of Which May Be Pertinent to Issues in Proceeding.Certificate of Svc Encl. W/O Rept.Related Correspondence ML19347D8511981-03-31031 March 1981 Forwards Endorsements 5 & 6 to Nelia Binder EB-31, Endorsement 5 to Maelu Binder XB-31,Endorsement 44 to Maelu Policy MF-58 & Endorsement 58 to Nelia Policy NF-188 ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19343D5261981-03-0404 March 1981 Advises of Review of Evacuation Roadway Network Re Facility. Traffic Control Beyond Emergency Planning Zone Will Avoid Congestion within Zone.Effective Traffic Mgt Plan Is Needed ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML19341D4641981-02-25025 February 1981 Forwards Intervenors Cleeton Exceptions to ASLB 810202 Partial Initial Decision ML19341C4871981-02-24024 February 1981 Forwards Endorsement 43 to Maelu Policy MF-58 ML19341C9131981-02-23023 February 1981 Requests Svc of Documents Upon Util Be Made to Tg Dignan Instead of Gh Lewald.Address Unchanged ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML20003B4821981-02-0909 February 1981 Forwards Endorsements 56,57 & 4 to ANI Policies NF-188, NF-188 & Binder EB-31,respectively & Endorsement 4 to Maelu Binder XB-31 ML19341B2671981-01-23023 January 1981 Informs of No Plans for Filing Application & Review Requests,Per NRC 801205 Request.Cp Receipt or Const Completion Dates Undetermined Until NRC Issuance of Policy for Resumption of CP Licensing ML19345C2711980-10-29029 October 1980 Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants ML19347B3151980-10-10010 October 1980 Forwards Amend 40 to Psar.Amend Incorporates Revised Section 13.3,emergency Planning,In Response to Final Emergency Planning Rule ML19330C2071980-07-14014 July 1980 Responds to IE Bulletin 80-11, Masonry Wall Design. Inaccessible Block Walls Surveyed & Program to re-evaluate Walls Near safety-related Sys Developed.Justification for re-evaluation Criteria to Be Submitted by 801108 ML19331E2871980-07-14014 July 1980 Forwards Recommendation for Item 3.1.6/3.2.4 Re Cable Combustibility for Fire Protection Review.Recommends That Licensee Be Required to Coat Okonite & Kerite Cables ML19323H6951980-06-0909 June 1980 Request Mod of First Page of Distribution List.Distribution List Encl ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19323F3761980-05-0101 May 1980 Submits Applicants' Response to ASLB 800327 Order Re Emergency Planning Hearing.Requests Reconsideration of ASLB Position on Previously Admitted Contention Re Emergency Planning.Related Correspondence Encl ML20062J3301980-04-18018 April 1980 Requests Response to Encl L Boyd Inquiry About Emergency Preparedness Around Facility ML19323G2211980-04-0808 April 1980 Expresses Concern Re on-job Intoxication of Facility Employees.Boston Herald American 800403 Article Encl ML19305C3711980-03-17017 March 1980 Responds to NRC Request Re Necessity of Antitrust Hearing Following Ma Municipals' Withdrawal of Petition to Intervene.Antitrust Hearing Unnecessary Re Instant Application ML19294C2701980-02-28028 February 1980 Requests Opportunity to Discuss Priority of NRC CP Activities in post-TMI Period.Utils Are Concerned About Availability of NRC Resources in Coming Yr to Deal W/Related Hearings.Nrc Resources Can Be Optimized ML19296D2931980-02-25025 February 1980 Forwards Endorsement 38 to Maelu Policy MF-58 ML19294B9081980-02-14014 February 1980 Corrects Typographical Errors & Omissions in Applicant 800209 Statement Filed in Response to ASLB Request Re Emergency Planning as Proper Issue in Hearings ML19260D6061980-02-0505 February 1980 Forwards Endorsements 50 & 51 to Nelia Policy NF-188 ML19257A7031980-01-0202 January 1980 Forwards 780209 Ltr to NRC Re J & s Pires & R & D Fitts Notice of Claims Against Util.Both Claimants Have Filed Suit ML19270H8001979-12-27027 December 1979 Forwards Design Review & Supplemental Recommendations Re Exposed Steel protection,self-contained Breathing Apparatus, Generation Seals,Fire Detector Testing,Cable Combustibility & Dc Power Sys Hazard Analysis ML19256F4471979-11-20020 November 1979 Notifies That 791119 Meeting W/Ma Wildlife Federation & NRC Will Be Rescheduled Either 791123 or Filing Date for Ma Wildlife Federation Pleadings Moved to 791130 ML19256F2971979-11-12012 November 1979 Informs of Minor Change in Schedule for Requests for Findings of Fact & Conclusions of Law.Possibility Exists of Stipulation Between Nrc,Intervenor Ma Wildlife Federation & Applicant ML19262A8891979-11-0808 November 1979 Discusses Applicant 791101 Transmittal of Four Documents on Revolving Credit Agreement.If Introduced as Evidence,State of Ma Reserves Right to cross-examine Rebuttal Testimony ML19260B1201979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision ML19260B1261979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision.Certificate of Svc Encl ML19210D7701979-11-0101 November 1979 Forwards Util & Bank Consortium 790731 Credit & Loan agreement,791012 Amend 1,State of Ma Dept of Public Util Orders Re Agreement & Util Affidavit ML19260C2131979-10-29029 October 1979 Responds to 790913 Request for Addl Info Needed to Complete Review of Util Response to IE Bulletin 78-10 Re Bergen- Patterson Hydraulic Shack Suppressor Accumulator Spring coils.Safety-related Hydraulic Snubbers Inspected in 1979 1994-12-13 Category:STATE/LOCAL GOVERNMENT TO NRC MONTHYEARML20042B4561982-03-19019 March 1982
[Table view]Ack Receipt of Response to 820203 Ltr.Requests NRC Evaluation of Revised Emergency Plans & Any Addl Public Documents Re Communications Between Util & NRC Concerning Emergency Plans ML19350C7931981-03-19019 March 1981 Informs That Commonwealth of Ma Reviewed Parties' Responses to ASLB 810219 Order.Aslb Should Schedule Hearings on Emergency Planning & Other TMI-related Issues for Sept 1981 ML19350B5321981-02-27027 February 1981 Informs That Commonwealth of Ma Needs Time to Evaluate Suppl to SER Re Emergency Planning,To Prepare New Interrogatories, to Evaluate Answers to Interrogatories & to Prepare Written Testimony.W/Notice of Appearance & Certificate of Svc ML20003C1181981-02-18018 February 1981 Forwards Commonwealth of Ma 810218 Exceptions to ASLB 810202 Partial Initial Decision ML19323G8941980-05-0202 May 1980 Responds to ASLB 800327 Order Requesting Date of Planned Testimony Re Emergency Planning Issue.Written Testimony Will Be Filed within 4-6 Wks from Receipt of NRC Evaluation. Related Correspondence ML19262A8891979-11-0808 November 1979 Discusses Applicant 791101 Transmittal of Four Documents on Revolving Credit Agreement.If Introduced as Evidence,State of Ma Reserves Right to cross-examine Rebuttal Testimony ML19260B1261979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision.Certificate of Svc Encl ML19260B1201979-11-0505 November 1979 Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision ML19256E2361979-09-0707 September 1979 Forwards Withdrawal of Appearance on Behalf of Commonwealth of Ma ML19209B0921979-08-22022 August 1979 Ack Receipt of NRC Response to Motion to Defer Forthcoming Evidentiary Hearings on Emergency Planning & Class 9 Accidents.Clarifies Relationship of Accident Risks to long- Standing Contention on Alternative Sites ML19242B1821979-08-0303 August 1979 Notifies That C Corkin Is No Longer Employee of Ma Atty General Ofc.Sm Leonard Is Now Chief of Environ Protection Div & Atty of Record in Const Licensing ML19259D5411979-07-30030 July 1979 Exhibits from Ma Atty General Omitted from Motion of Commonwealth of Ma to Defer Forthcoming Evidentiary Hearings on Emergency Planning & Class 9 Accidents.Reprint of 44FR41483 & SECY-79-450 Encl ML19207B9611979-07-16016 July 1979 Forwards Motion to Schedule Testimony of Boston Edison & Commonwealth of Ma for Date Not Before 790723 ML20136B3461979-06-29029 June 1979 Forwards Testimony of Js Fitzpatrick & Jg Buckley. Certificate of Svc Encl ML19246C0251979-06-14014 June 1979 Forwards Commonwealth of Ma & Intervenors Cleetons 790613 Stipulation Re Emergency Planning Issue ML19241B6291979-06-0808 June 1979 Forwards Commonwealth of Ma 790608 Interrogatories Directed to Boston Edison Re Need for Power Issue ML19246B8601979-06-0707 June 1979 Forwards Commonwealth of Ma 790607 Interrogatories Directed to NRC Re Need for Power Issue ML19269E4991979-05-0909 May 1979 Forwards Pf Levy 790509 Testimony on Behalf of State of Ma ML19263E1261979-04-13013 April 1979 Clarifies Commonwealth of Ma Request for Extension of Time to Comment on Draft Suppl to Fes (NUREG-0530) ML19263D7401979-04-10010 April 1979 Forwards Comments of the Commonwealth of Ma on Draft Suppl to Fes Re Alternative Sites ML19294A7351979-02-0606 February 1979 Requests Right to Raise Class 9 Issue at Proceeding After Commission Announces Its Decision on Matter ML19305A1621978-12-0505 December 1978 Forwards 781024 Final Decision of Ma Energy Facilities Siting Council Conditionally Approving Annual Suppl to Boston Edison Co'S Long Range Forecast ML20147F2321978-11-20020 November 1978 Informs NRC That Provincetown,Ma Annual Town Meeting Passed a Resolution Opposing Const of Facility ML20062D9101978-11-0202 November 1978 Disagrees W/Util Decision of 781020 Not to Recirculate Final Environ Statement 1982-03-19 |
Text
o
<~~.
7 y ,. THE COMM0tNEALTH OF MASSACHUSETTS A
+ fQ f DEPARTP.ENT OF THE ATTORf1EY GEtiERAL h,g {iIl $ JOHN 'a'. McCOPJ'.iCK STATE OFFICE BUILDING
~, . ':" j CNE ASH 3CETO. PLACE, ECSTON 02103 w -r FRAf;CIS X. BELLOTTI . . . .
CHARLES CORKIti II, CHIEF ATTO:C;EY CENERAL E:iVIRONMENTAL PROTECTION DIVISICN February 6, 1979 Tel: (617) 727-2265 Edward Luton, Esquire Dr. Richard F. Cole Atomic Safety and Licensing Atomic Safety and L:.rensing Board Panel Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Cornission Cormission
';ashington, D.C.
. 20555 Washingten, D.C. 2:555 Dr. A. Dixon Callihan Union Carbide Corporation P. O. Box Y Oak Ridge, Tennessee 37830 Re. Boston Edison Company et al.
(Pilgrim Nuclear Generating Station, Unit 2)
Docket No. 50-471 Gentlemen:
The question of consideration of Class 9 accidents in the Staff's environmental statement on the floating nuclear power plant manufacturing license application is pending before the full Com-mission. In the Matter of offshore Power Systems (Floating Nuclear Power Plants), Docket No. STN 50-437, 8 NRC (1978)1/. As you no doubt are aware, the staff has argued to the Commission that in certain situations, NEPA consideration should be given to Class 9 accident consequences for both land-based and floating plants.
The Commonwealth brings this matter to the Board's atten-tion at this time, and requests the right to raise the Class 9 issue in the instant proceeding after the Commission has announced its decision on the c"sistion. jf Since/-rely, -
Q&l'./& .' { $
1' f
/,,
, h'- Chi'ef bHARLESCORK
, IN II /'h i
is . :: a ;eza 2 -o h
CC:LB:JK --, F cc. Pilgrim service list 5 :
(Qk on,,. 27
- c. , f,._g) s [j M '
~1/
On September 29, 1978, the Appeal Board granted OP3's motion to certify thic question to the Cormission. ALAB-500, 8 NRC 194 (1978).
On December 8, 19 78, the Commission agreed to view the question.
8 NRC (1978).