Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Facility Investigation Revealed No Anchor Bolts Installed in Concrete Block Walls for safety-related Hangers
ML19291C482
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/05/1979
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-02, IEB-79-2, NUDOCS 8001240478
Download: ML19291C482 (1)


Text

TL Frederick W. Schneider Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Vice President Production December 5, 1979 Mr. Boyce H. Grier, Director U.

S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NPT IE BULLETIN NO. 79-02, REVISION 2 NO. 1 AND 2 UNITS SALEM GENERATING STATION In response to your letter of November 8, 1979, transmitting NRC IE Bulletin 79-02, Revision 2, which was received on November 13, 1979, the following information is submitted for your review.

The program of examination of concrete anchor bolts undertaken at Salem addressed those anchor bolts installed in structural shapes, as well as those installed in flat base plates.

The methods of examinations were ultrasonic testing to determine embedment depth and torquing of the bolt to verify proper wedge set.

Investigation reveals that no anchor bolts are installed in concrete block walls for safety-related hangers.

Very truly yours, CC:

Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.

C.

1794 277 Office of Nuclear Reactor Regulation Division of Operating Reactors Washington, D.

C.

Mr. L. J. Norrholm 7

L Hancocks Bridge, NJ g001 4Q q

-