IE Insp Repts 50-254/79-27 & 50-265/79-24 on 791105-09. Noncompliance Noted:Failure to Maintain Adequte Isolation Zone & Failure to Search Individuals & hand-carried Items Prior to Admittance.Details Withheld (Ref 10CFR2.790)
ML19291C374
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/18/1979
From: Belanger T, Christoffer G, Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19064A037 List:
References
50-254-79-27, 50-265-79-24, NUDOCS 8001240304
Download: ML19291C374 (2)


See also: IR 05000254/1979027

Text

.

I

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF IriSPECTION AND ENFORCEMENT

REGION III

Report No. 50-254/79-27; 50-265/79-24

,

Docket No. 50-254; 50-265

License No. DPR-29; DPR-30

Licensee: Commonwealth Edison Company

Post Office Box 767

Chicago, IL 60690

Facility Name: Quad-Cities Nuclear cower Station, Units 1 and 2

Inspection At: Quad-Cities Site, Cordova, IL

~

Inspection Conducted: November 5 - 9, 1979

Date of Last Physical Security Inspection Visit: April 16-20, 1979

Type of Inspecti n: Unannounced Physical Security

.h.

M&

Inspectors:

G. M. Christoffer4 5

/f--//-99

? .L &angt/

J. L. Belanger

/2 -/f' M

'>$}H. W of

.s>

/8'//'97

J. James

L

J.h . ili

h f

Approved By:

A

Safeguards Branch

Inspection Summary

Areas Inspected:

Included a review of the Security Plan; Security Program

Audit, Security Organization, Protected Area Physical Barriers; Vital

Area Physical Barriers; Lighting; Access Control (Identification, Author-

ization and Badging); Access Control (Search); Access Control (Escorting);

Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment

Aids; Ccamunications; Testing and Maint-nance; Compensatory Measures;

Power Supply; Response Locks; Keys and Combinations; Records and Reports;

Follow-up on previous items of noncompliance; Follow-up on IE Bulletin

No. 79-16.

1795

142

8001240 3of

'

.

.

.

The inspection involved 102 inspector hours onsite by three NRC inspectors.

The inspection was started during regular working hours.

A total of 33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> were accomplished during off-shift periods.

pesults: The licensee was found to be in compliance with NRC requirements

within the 20 areas examined except for the following items:

1.

Physical Barriers / Protected Area - The licensee failed to maintain

an adequate isolation zone.

(Infraction)

2.

Access Control (Search) - The licensee failed to perform an adequate

search of individuals and hand carried items prior to admittance

into the protected area.

(Infraction)

(Details:

10 CFR Part 2.790(d) Information)

.

.

1795

143

-2-

.