Forwards QA Program Insp Rept 9990031/79-02 on 791029-1102 & Notice of Deviation
ML19291C329
Person / Time
Issue date: 11/29/1979
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tharp W
GUY F. ATKINSON CO.
Shared Package
ML19291C330 List:
References
REF-QA-99900031 NUDOCS 8001240211
Download: ML19291C329 (2)


Text

%-,q, _ y s <

o.

  • ** "' 4e UNITED STATES

((*h Io NUCLEAR REGULATORY COMMISSION g

REGloN IV n

$..( [

. j 611 P.YAN Pt.AZA DRIVE,5UlTE 1000 ARLINGTON, TEXAS 76012

(

t 2 9 NuV 1979

%, ' *2.....#

Docket No. 99900031/79-02 Bingham-Willamette Company ATTN:

Mr. W. E. Tharp President 2800 N. W. Front Avenue Portland, Oregon 97210 Gentlemen:

This refers to the QA Program inspection conducted by Mr. L. E. Ellershaw of this office on October 29-November 2, 1979, of your facility at Portland, Oregon, associated with the manufacture of nuclear pumps and reactor internals and to the discussions of our findings with members of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable qut.lity. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.

Areas examined and our findings ara discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventative measures were or will be completed.

1795 046 800124 0 21)

Bingham-Willamette Company 2

In accordance with Section 2.790 of the Commission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Docuuent Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

?

j

,\\_'

L'18 ap Vendor Inspection Blanch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900031/79-02 1795 047