Text

.

Mb TotEDO EDISON RoeARa P. CROUSE Docket No. 50-346 (g$e License No. NPF-3

" ' ' ' **528' Serial No. 1-113 January 11, 1980 Mr. James G. Keppler Regional Director, Region III Directorate of Regulatory Operations U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

IE Bulletin 79-28 requested that we review our use of NAMCO Model EA180 Limit Switches in safety related equipment inside or outside containment because of improper gasket material.

Our review has indicated that we have none of the subject switches installed at Davis-Besse Nuclear Power Station Unit No. I facility. However, we do have fifteen in stock that had defective gasket material. At the present, nine of these switches have had the gasket replaced, and the other six will be changed upon receipt of the gaskets from NAMCO, before they are placed in service.

Very truly yours, RPC: RCH: cts cc:

U. S. Nuclear Regulatory Commission Division of Reactor Operations Inspections Office of Inspection and Enforcement Washington, D. C. 20555 1795 022 -

b i41980 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652

>I 800134 0 1%

,