Text
e NSP NORTHERN STATES POWER COMPANY M I N N E A PO LI S. M I N N E S OTA 5 5401 January 11, 1980 Mr. James G. Keppler, Director Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dockets No. 50-282 and 50-306 In response to Item 6 of IE Bulletin 79-17, Revision 1, the following is offered:
Visual inspection required by Item 2(a) of the Bulletin was done for both units in November 1979.
Inspection required by Item 2(b) was completed on Unit 2 in December 1979. Visual inspection was done again for Unil 1 in December 1979 and will continue to be done monthly until the Item 2(b) in-spection is done this summer. The visual inspections were satisfactory; no corrective actions were necessary.
Yours truly,
&ena%~r D. E. Gilberts Vice President Power Production ec:
Mr. G. Charnoff NRC Office of Inspection and Enforcement Washington, D. C.
DEG:nk