Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Relays Not Planned for Use in safety-related Sys
ML19291C168
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/03/1980
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-79-25, NUDOCS 8001230057
Download: ML19291C168 (1)


Text

41C-1HF C !. E V E ll t.' P E L E C T R ! C I L L U t,'. t h' A T ! U C P f' f ' ' ' " '

ILLUMINATING BLDG. m PUBLIC SQUARE e CLEVELAND, OHIO 44101 e TELEPHONE (216) 623-1350 m MAIL ADDRESS: P. O. BOX 5000 Dalwyn R. Davidson #

VICE PRESID. NT SYSTE M E NGINE E RING AND CONSTRUCTION January 3, 1980 Mr. James G. Keppler, Director Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Glen Ellyn, IL 60137 Re: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 IE Bulletin No. 79-25

Dear Mr. Keppler:

In accordance with your request, the following has been prepared as a response to IE Bulletin 79-25, " Failures of Westinghouse BFD Relays in Safety-Related Systems." The Westinghouse relays mentioned in this Bulletin are not planned for use in safety-related systems at our facility. We conclude, therefore, that this Bulletin is not applicable to the Perry Nuclear Power Plant Project.

Very truly yours, II n U t]/ /%

Dal R. Davidson Vice President System Engineering and Construction DRD/cmv cc: Victor Stello, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 1791 194 J AN 141980"

~ -

8001230 b