Responds to NRC Re Violations Noted in IE Insp Repts 50-295/79-24 & 50-304/79-22.Corrective Actions:Fire Protection Equipment Brought to Site
ML19291C160
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 01/07/1980
From: Peoples D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19291C155 List:
References
NUDOCS 8001230045
Download: ML19291C160 (2)


Text

'

Commonwealth Edison One First National Plaza, Chicago. Illinois

, Address Reply to: Post Office Box 767 Chicago, Illinois 60690 e

January 7, 1980 Mr. James G.

Keppler, Director Directorate of Inspection and Enforcement - Region III U.S.

Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Zion Station Units 1 and 2 Response to IE Inspection Report 50-295/79-24 and 50-304/79-22 NRC Docket Nos. 50-295/304 Reference (a) :

R.

F. Heishman letter to C.

Reed dated December 10, 1979

Dear Mr. Keppler:

The following is in response to the inspection conducted by Mr. J.

E.

Kohler on October 1 thru November 5, 1979 at Zion Nuclear Power Station Units 1 and 2.

Reference (a) indicated that certain activities appeared to be in non-compliance with NRC requirements.

These activities are addressed in the enclosure to this letter.

Please refer any additional questions you may have on this matter to this office.

Very truly yours, I

ka D.

L.

Peoples Director of Nuclear Licensing Enclosure 1791 128 s oon a" 0y5

50-295/79-24 50-304/79-22 s

ENCLOSURE Technical Specification 6.2.A.ll requires adherance to fire protection program implem,entation procedures.

Contrary to the above, on October 31, 1979, welding took place in the Unit 1 Turbine Building without a portable fire extinguisher at the job sita, as specified by the approved welding authorization card.

Corrective Action Taken and the Results Achieved:

10-31-79 the welding job in question was stopped until the weld operator had a protable fire extinguisher on the job site.

This action required about 15 minutes.

Both the welder and his fore man were advised that if " Fire Extinguisher" was specified on the Welding and Cutting Permit, it must be on the job site.

If installed fire equipment in the area of work was to be considered protection while working it should be so indicated on the Welding and Cutting Permit.

Not just fire extinguisher.

Corrective Action to be Taken to Avoid Further Noncompliance:

The Master Mechanic held a mceting on November 1, 1979 with the foremen in his department.

At that time, Maintenance Department Administrative Instruction 9-51-78 was reviewed to insure all present understood the problem at hand.

Date of Full Complaince:

November 1, 1979 1791 129