AVER AGE D AILY UNIT POWER LEVEL 50-368 DOCKET NO.
UNIT ANO-2 DATE 1/11/80 C0%1PLETED BY R.A. Pendercraft TELEPHONE 501/968-2519 510NDI December. 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (51We-Net) istwe-Net) 0 474 g7 6
563 2
g 116 652 3
39 4
184 20 375 184 503 5
21 186 707 6
156 707 7
33 391 709 g
,4 399 45 9
25 398 0
10 26 393 0
11 2,
415 0
12
,3 416 276 13
,9 384 312 34 30 60 2
15 33 392 16 INSTRUCTIONS On this format hs: the r.cnge daily umt,xmer leselin N!We Net for each day m the reporting inonth. Compute to the nearest whole mepwa t.
(9/77) 1791 021 800121017I
OPERATLNG DATA REPORT DOCKET NO. 50-368 DATE 1/11/R0 CO5!PLETED BY D s pa,6raraft TELEPHONE 501/968-2519 0'ERATING STATUS Arkansas Nuclear One-Unit 2 Notes
- 1. Unit Name:
December 1-31, 1979
- 2. Reporting Period:
- 3. Licensed ThermalPower(MWt):
2815 959
- 4. Nameplate Rating (Gross MWe):
912
- 5. Design Electrical Rating (Net MWe):
NA
- 6. Maximum Dependable Capacity (Gross MWe):
^
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted. lf Anv (Net MWel:
N0ne NA
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cumulative 744.0 8760.0 9504.0
- 11. Hours in Reporting Period 605.9 3393.5 3828.4
- 12. Number Of Hour, Re.:ctor Was Critical 8.0 2150.9 2293.1
- 13. Reactor Reserve Shutdown Hours I4. Hours Generator On.Line 537.1 2984.1 3036.9
- 15. Unit Reserve Shutdown Hours 0.0 21.7 21.7 813274.0 3452233.0 3496811.0
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated IMWH) 251195.0 977718.0 983285.0 232884.0 881825.0 885809.0
- 18. Net Electrical Energy Generated (MWHI
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (U>ing MDC Net, NA Until Cor:u:lercial Operation
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate V
- 24. Shutdowns Scheduled Oser Next 6 Months iType. Date and Duration of Eacht:
25, if Snut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operationi:
Force ast Achiesed INITI A L CRITICALITY 12-05-78 INITIAL ELECTRICITY.
12-26-78 CO%DIERCIAL OPER ATION Early 1980 g 91 0 22 '""'
DATE: Deccaber 1979 REFUELING INFORMATION 1.
Name of facility.
Arkansas Nuclear One - Unit 2 2.
Scheduled date for next refueling shutdown. 2/1/81 Scheduled date for restart following refueling. ~ 4/1/81 3.
4.
Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
Yes. Descriotion of effects of new core loading 5.
Scheduled date(s) for submitting proposed licensing action and supporting information. 12/1/80 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None 7.
The number of fuel asse=blies (a) in the core and (b) in the spent fuel storage pool. a) 177 b) 0 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is plinned, in nu=ber of fuel assemblies.
present 486 increase size by 566 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE: 1989
l*
50-368 DOCK ET NO.
UNIT SilUTDOWNS AND POWER REDUCTIONS ANO - Unit 2 UNIT NAhlE nATE 1/1f780 005fPLET ED HY R.A. Pendercraft REPORT MONTil December TELEPilONE 501-968-2519 9*e
.! ?
3 h$-
Licensee
,E -t, Cause A Corrective No.
Date 3-Eg
,a s 5 Event a?
el Action to 9
H yE 5
j5g Repori e EU
}'
Prevent Recurrence N
5 O
79-22 10-4-79 S
43.8 11 2
None IF AIR DRY Outage Continued from previous month.
m 1%
79-23 12-6-79 F
10.6 A
2 None CB VALVEX Pressurizer Sp:ay Valve stuck open valve was repaired.and returned to service.
79-24 12-20-79 F
12.6 A
3 None llc llTEXCil llotwell level flashed causing the loss of a feedwater pump.
Dumps going to Condensor were adjusted to correct situation.
79-25 12-25-79 F
104.4 A
3 None N/A N/A Condenser tube leaks forced the outage.
Failed tubes were plugged.
79-26 12-30-79 S
35.5 B
3 None N/A N/A Tripped all RCP's per T.P. 2800.01 Appendix AA l
I I
2 1
4 F: Forced acason:
Method:
Exhibit G. Instructions S: Scheduled A liquipment failme(lixplain) 141anual for Piep.uation of Data 041aintenance of Test 24f anual Scram.
Entry Sheets for I.icensee C-Refueling
.t Autonutic Scram.
I vent Itepori 111 R) File INUREG-D Itegulatory Rest iction 4 Other (IApiain) 0161) 1 -Operator Training & License INamination F Administrati.e 5
G-Operational 1 r ror (lixplaia)
Inhibit I - S.nne Source 07/77)
Il Other (lixplain) e
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- DECEMBER, 1979 UNIT II The unit was shutdown during the first two days of December. On December 2, the unit was returned to power and testing was continuing.
A pressurizer spray valve failure on the 6th of December forced the unit down.
The return to power occurred the next day and escalation to 80% power for testing continued. Condenser hotwell problems caused a trip on December 20.
The unit returned to power on 12-21-79 and testing continued until on the 25th of December, condenser tube failures forced a four day repair outage. On the 29th of December, the unit was returned to power and testing continued. A scheduled outage occurred on 12-30-79 when all reactor coolant pumps were tripped per the startup testing sequence. On 12-31-79, the unit was returned to power and testing has continued throughout the remainder of the month.
1791 025