ML19291B963
| ML19291B963 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/27/1979 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-17, NUDOCS 7912140473 | |
| Download: ML19291B963 (6) | |
Text
. ' '
Alabama Po p'pwnpany 600 North 1R'4 4.reet g
G#'
Post Office Boi2641 g
Birmingham. Alabama 35291 8
Telephone 205 323-5341 Um g
< 8,
F. L. CLAYTON, JR.
AlabamaPower Senior Vice President.
the southern electnc sprem
' ' [ ' ' 'f '< ::
NU 30 November 27, 1979 F
Docket No. 50-348 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Ctmnission Region II 101 Marietta Street, N. W.
Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Enclosed is Alabama Power Orpany's response to I. E.
Bulletin 79-17, rev. 1, " Pipe Cracks in Stagnant Borated Water Systens at PWR Plants".
Yours very truly, kFN.fSat Cla
, Jr.
FICjr/INE/ntab Enclosure cc: Mr. R. A. Thcznas Mr. G. F. Trtubridge Office of I & E Divn. of Reactor Operations Inspection Washington, D. C.
20555 1582 05i
'7T09'77..
79121404-73
'OmcrAL COM,;
T nnIEURE:
In response to I.E.Bulletin 79-17 revision 1, Alabama Power ommits to conduct nonthly visual examinations as requested in itan 2(a) rev.1 of the Bulletin until ultrasonic examinations required by itan 2(b) are cxxnpleted. 'Ihe additional ultrasonic examinations will be perfonned with-in the next twelve (12) months.
'Ihe number of welds to be visually examined in each systan are identified in the colunn titled " Selected in Accordance w/ Para 2.a" in the attached Table I, sheets 1 through 4.
The number of additional welds to receive ultrasonic examination are identified in the column titled
" Selected in Accordance w/ Para 2.b".
If significant cracking is identified during examinations conducted under itans 2(a) or 2(b), all welds in the affected systan shall be subject to examination and repair considerations.
Alabama Power Ompany cxmmits to provide a written report within 30 days of the date of otxnpletion of the examinations required by Itans 2(b) or 2(c) and a written report within 14 days of ampletion of examinations required by Itan 2(a) if cracks are identified.
1582 052
(
TABLE.
I SH.1 0F4-SYSTE.M 6I5.- Acc.vMuteroct.s SELECTED IN ACCORDAMC.E SEL.IN ACCORDANCE SEf_ IN
.r W/ PARA..
2d W/ PARA. 26 ff$4gj}c fh,jf,}fQ{
0 INE WALL SCH. TOTA \\
IoTo I,s.I /
ACCESS.
ACCESS.
N. D. E.
SAL.
25 %
REMARKS 17 E.
OR SIEE.
WELDS
~
12" sc4.40s (G
O O
O O
O l2" scH. (4o 2s o
o o
o o
LTEDf@}@g%WogjfoEd$uIlid' W
k o
bl I
t TABLE.
I SH.1 0F 4 '.
SYSTEM 5,IG. (u.u.s,t3 ELECTE ACCgDAMCE SEL.
C OANCE f
h' If D.
$b bt!kH' hk[bs ACCESS. (([gg, f fdg/
I y
BAL.
25 %
REMARKS G
sc.a.4ns 24-24-5 O
5 co 8
mu. 1.o
~) O 10 i
O I
2.
f scu. l6o 8
'8 l
o l
2 3"
scu,160
\\96 12 6 la o
13 31 o
A l
3
?
TABLE I
SH._ 3 0F 4 -
SYSTLM 6.I.S. (2Nze./.exei
~
SELECTED IN ACCORDAMCE SEL.lN ACCORDANCE SEL IN
}
W/ PARA, 2a W/ PARA 26
$gre, Ort.3i,,%g_
p,y Ni$!. Et$k"' M[bs ACCESS, /@[{gg, jhj[-
BAl-.
25 %
REMARKS l(/
ScH.hs 9
9 I
O I
2 14 "
eH.40s 25 25 2
0 2
5 12' scVM 75 l 2-2 3
o o
/2" ScMth to O
O 7
0 0
10 "
ScM #
18 4 184-17 I(o I
42.
10" scW40 25 co l
0 0
2 8"
seg40 (o7 32.
5 5
0 8
8' ScH.l60 SS O
O O
O O
6" ScW60 77 0
0 3
O O
4" scat 60 4
0 0
0 0
0 B"
. Sc/MO 65 46 5
2 3
//
)
im O
TABLE.
I SH. 4 0F SYSTE.M CTMT SPRAY ELECTED IN ACCORDAMCE SEL.IN ACCORDANCE SE' 'N
)jDDR02,rd..t1 W/ PARA..
2a W/ PARA. 26
. %O}Dg ic g
S{H.
ACCESS. jk[ESS. ha'h SAL.
25 %
REMARKS W
g T
ScH.40 20
'?.,0 2
0 2,
5 10' scH40 34 34 4-O 4-9 8"
scu.40 6
6 i
O I
2.
3" scit.4o 26 26 3
0 3
7 e
k F5 R
m I